BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work for a road / highway in Kearney, Nebraska. Conceptual plans call for site work for a road / highway.

https://lexch.com/news/local/article_655b6f81-396d-4aea-8aa2-b01ffb45f0af.html Detour designated as I-80 work continues in Buffalo County GRAND ISLAND — The Nebraska Department of Transportation announced a designated detour route as work continues along Interstate 80 near Elm Creek in Buffalo County. Currently, traffic is in head-to-head status amid ongoing construction. In the event of a crash or incident, the detour is intended to maintain emergency access and reduce delays, while keeping construction crews and first responders safe. If an incident occurs requiring a detour between mile marker 252 on I-80 west of Kearney and Exit 263, westbound and eastbound traffic will be diverted using Nebraska Highway 44 south to U.S. Highway 34 west and Nebraska Highway 23, then north on U.S. Highway 283 and vice versa. Traffic signs will be in place to divert traffic. Work includes full-depth concrete replacement of I-80 in the westbound direction of travel, two bridge widening and re-decks, and construction of a box culvert to replace a bridge. At U.S. 183 and the Elm Creek interchange there will be concrete joint sealing work, and the Elm Creek ramps will be replaced up to the gore. Additionally, guardrail work has begun along the project route. Head-to-head traffic is anticipated to last until mid-November, when it will return to normal operation with two lanes in each direction. Anticipated full completion of the project remains spring 2026. Motorists are reminded to drive cautiously in and near work zones, to buckle up and to put phones down. ----------------------------------------------------------------------- Location: District 4 DMS Retrofit , Detailed Termini: District 4 Hwy : I-80 Begin RP : 270.00 Length : 0.0 County : Buffalo As of December 2 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. NEDOT - Removal of Existing & Install New DMS Panels - I-80 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$966,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
20
Bidding Soon
202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

Interstate 80, Kearney, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.