BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tupelo, Mississippi. Completed plans call for site work for a water / sewer project.

North Benton Co ARPA Water System Imp Contract A-D. Contract A: Provide materials for a working AMR system with drive by data collection and approximately 185 radio read meters. Contract B: Replace approximately 185 radio read meters provided by Contract A. Contract C: Install Approximately 31 gate valves at existing hydrants. Contract D: Install 200 GPM ground water well (approximately 1,350 ft. deep). Includes yard piping, chemical feed systems, electrical, control system improvements, and an alternate for a portable generator. Minority and Women's Business Enterprises Are Solicited to Bid on This Contract as Prime Contractors and Are Encouraged to Make Inquiries Regarding Potential Subcontracting Opportunities, Equipment, Material and/or Supply Needs. This Project is Being Supported in Whole or in Part by the American Rescue Plan Act (Arpa), Federal Award Number Arwai-g-0050017 Awarded to the North Benton County Water Association by the U.s. Department of the Treasury." Any contract or contracts awarded under this invitation for bids are expected to be funded in whole or in part by anticipated funds from the ARPA Rural Water Associations Infrastructure Grant (RWAIG). Neither the State of Mississippi, the Local Governments and Rural Water Systems Improvements Board, nor any of their employees is or will be a party to this invitation for bids or any resulting or related contracts. This procurement will be subject to all applicable sections of the Mississippi Code of 1972, Annotated, as they apply to local governments, in accordance with RWAIG Program Regulations. Based on the Assistance Listing: Coronavirus State and Local Fiscal Recovery Funds and Part 2 of the US Treasury State and Local Fiscal Recovery Funds Compliance and Reporting Guidance (v3.0 February 2022) (Compliance Guide), the following Uniform Guidance provisions will be required in all contracts: o Subpart A, Acronyms and Definitions o Subpart B, General provisions o Subpart C, Pre-Federal Award Requirements and Contents of Federal Awards (except 2 CFR 200.204, .205, .210, and .213) o Subpart D, Post Federal; Award Requirements (except 2 CFR 200.305(b)(8) & (9), .308, .309, and .320(c)(4)) o Subpart E, Cost Principles o Subpart F, Audit Requirements o 2 CFR Part 25 (Universal Identifier & System for Award Management) o 2 CFR Part 170 (Reporting Subaward and Executive Compensation Information) o 2 CFR Part 180 (OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Non-procurement) o 2 CFR 200 Appendix ii Bids will be accepted only under the name of the Bidder to whom contract documents have been issued by Plan House Printing, on behalf of the Engineer, and whose name appears on the official list of Plan holders maintained by Plan House Printing. Each bidder must deposit with this bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Simultaneously with his delivery of the executed contract, the Contractor shall furnish surety bonds subject to the conditions provided in the Information for Bidders. All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout Each Bidder is responsible for inspecting the site and for reading and being thoroughly familiar with the Contract Documents. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation in respect to this Bid. A conditional or qualified Bid will not be accepted. Award will be made to the lowest or best responsible, responsive Bidder. The Owner reserves the right to waive any informality or to reject any or all Bids. document notes The only requirement for account registration is a valid email address. Questions regarding website registration, online orders and/or electronic bidding shall be directed to Plan House Printing at (662) 407-0193. A. Mississippi Procurement Technical Assistance Program (MPTAP) Mississippi Development Authority, Minority & Small Business Development Woolfolk Building, 501 North West Street, Suite B 01, Jackson, MS 39201. B. Sharon Butler (Procurement Advisor), NE MS Contract Procurement Office, 318 7th\ Street North, Columbus, MS 39703, P.O. Box 1805, Columbus, MS 39703-1805

GC Bidding

Water / Sewer

$500,000.00

Public - County

Site Work

16

20

13

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
33
Bidding Soon
325
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

December 12, 2024

img_map_placeholder

Multiple Locations, Tupelo, MS

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.