Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in Hinesville, Georgia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Sewer System Modification to include Stonehenge Pump Station upgrade and piping system modifications. The work to be performed consists of furnishing all labor and materials to complete the Sewer System Modification. More specifically, the project will consist of a 175 LF 10" PVC Force Main, 1450 LF 12" NPRL, 8050 LF of 14" HDPE, 760 LF 8" PVC Sewer Gravity Main, 550 LF 15" PVC Sewer Gravity Main, including directional bores, and removal and replacement of equipment at the Stonehenge Pump Station. Plans, Specifications, and Contract documents are open to public inspection at the City of Hinesville City Hall, 115 East M.L. King Jr. Drive, Hinesville, GA 31313 Each Contractor must prequalify for bid by submitting a completed "Statement of Bidder Qualifications" form supplied by the Engineer. Bids will be accepted from prequalified bidders only. Bids must be accompanied by a certified check or bid bond in an amount equal to at least five percent (5%) of total amount bid for the completed work. No bids may be withdrawn for a period of sixty (60) days after the closing time schedule for receipt of bids. The Owner reserves the right to accept or reject any or all bids and to waive informalities. Award of the contract, if it is awarded, will be to the lowest responsible bidder. The M/WBE GEFA and City goal for this project is 4% MBE and 4% WBE, for a total M/WBE participation of 8%. All M/WBE documents must be submitted in a separate sealed envelope, otherwise bid may be rejected. Question Deadline 10/16/2024 Requests for interpretations of Drawings and Specifications must be made in writing to the Engineer no later than seven (7) days prior to date set for receipt of bids, and failure on the part of the successful bidder to do so shall not relieve him as Contractor of the obligation to execute such work in accordance with a later interpretation by the Engineer. All interpretations made to bidders will be issued in the form of an addendum to the Plans and Specifications will be sent to all bidders. The requirements of such an addendum are to be included in the bids, and in closing the contract, the addenda will become a part thereof The Bidder further proposes and agrees hereby to commence work under his Contract, with adequate force and equipment, on a date to be specified in written order of the ENGINEER and shall fully complete all work hereunder within One Hundred Eighty (180) Days for Stonehenge Pump Sation with possible extension for generator, and Two Hundred (210) consecutive days for the NPRL Main Installation from and including said date. If two contracts the time will run concurrently. If one contract the overall time will be Three Hundred (300) Days for the entire project but the time for Stonehenge Pump Station will remain at 180 days with the generator caveat.
Post-Bid
Water / Sewer
$7,000,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2024
December 23, 2024
To Be Determined, Hinesville, GA
Related To This Project
Hinesville, GA
Bid Date: Nov 13 2024
Hinesville, GA
Bid Date: Oct 17 2024
Hinesville, GA
--
Hinesville, GA
--
Hinesville, GA
Bid Date: Nov 18 2024
Hinesville, GA
Bid Date: Nov 21 2024
Hinesville, GA
Bid Date: Dec 05 2024
Hinesville, GA
Bid Date: Oct 01 2024
Hinesville, GA
Bid Date: Oct 21 2024
Hinesville, GA
Bid Date: Oct 23 2024
Hinesville, GA
Bid Date: Sep 12 2024
Hinesville, GA
Bid Date: Sep 20 2024
Hinesville, GA
Bid Date: Sep 20 2024
Hinesville, GA
Bid Date: Sep 16 2024
Hinesville, GA
Bid Date: Sep 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.