Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 19, 2024 at 7:00 PM
Updated October 1, 2024
Renovation of an educational facility in Bath, Pennsylvania. Completed plans call for the renovation of a educational facility.
George Wolf Elementary School HVAC Replacement Project in the form of MULTIPLE lump sum contracts. Contract 1: General Construction Contract 2: Mechanical Construction Contract 3: Electrical Construction The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Selective demolition 2. Selective renovations The Work under the Electrical Construction Contract includes all construction and other activities traditionally recognized as electrical work required by any of the Contract Documents including, but not limited to, the electrical drawings, specification Divisions 00, 01, 26, 28, except when specifically assigned to another contract for construction. Work in the Electrical Contract includes, but is not limited to, the following: 1. Demolition of existing electrical systems as noted and required for renovation work. 2. Electrical distribution. 3. Electrical grounding. 4. Lighting and power branch wiring. 5. Communication and systems. 6. Special electrical systems, 7. Electrical connections to equipment furnished under other contracts. 8. Structural supports, hangers, sleeves and inserts. 9. Perform all starting, commissioning, testing, adjusting, balancing and training of all electrical systems and equipment in accordance with the manufacturers' recommendations and in conjunction with the Owner's Commissioning Verification and Testing Agent(s). 10. Luminaires, lighting controls and all accessories. 11. Fire detection and notification systems. 12. Conduits and raceway for special systems as required. 13. Emergency lighting systems. 14. Coordinate work with all contractors including, but not limited to plumbing, general and HVAC contractors. Coordinate and confirm locations and rough-in for all work with all contractors. Make location adjustments as required. 15. Cable tray for all work as specified. 16. Raceways for all work. 17. All rough-in including conduit, pull wire in conduit, and back boxes for all work. 18. Floor and wall boxes for all work. 19. Furnish and install all accessories, hangers, Velcro wraps, etc. 20. Provide electrical dimensions and drawings and assist HVAC Contractor in preparation of coordination drawings. 21. Firestopping of Electrical Contractor Work. 22. Provide equipment and all necessary wiring for interfacing of the following systems: a. HVAC equipment b. Temperature control c. Plumbing equipment d. Gymnasium equipment and operable partitions e. Kitchen equipment f. Motor-operated roller shades g. Theatrical lighting and control systems. 23. 24. The EC is responsible for maintaining power to all areas of the occupied project for all phases of the project. Also see Section 015000 "Temporary Facilities and Controls" for temporary power needs. 25. The EC is responsible for maintaining existing fire alarm system in all Phased areas of construction. 26. Coordinate utility transformer installation and all primary and secondary cable terminations with local utility Question Deadline 10/16/2024 Questions received less than five (5) days prior to the date for opening of Bids may not be answered All questions must be submitted in writing as follows. Phone calls are not permitted. All questions must be sent to: 5.3.1 All questions must be sent to: Chris Haller, (CHaller@chasolutions.com) CHA 5.3.2 All MEP questions must be copied to: Jeff Machik (jmachik@snyderhoffman.com) Snyder Hoffman Associates, Inc.
Bid Results
Educational
$464,628.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 31, 2024
December 30, 2024

300 Allen St, Bath, PA
Related To This Project
Bath, PA
Bid Date: Jul 17 2019
Bath, PA
Bid Date: Sep 06 2019
Bath, PA
Bid Date: Nov 06 2024
Bath, PA
Bid Date: Jul 15 2024
Bath, PA
Bid Date: Apr 29 2021
Bath, PA
Bid Date: Jul 01 2019
Bath, PA
Bid Date: Jul 31 2023
Bath, PA
Bid Date: May 06 2021
Bath, PA
Bid Date: Apr 27 2022
Bath, PA
Bid Date: Jul 25 2024
State College, PA
Bid Date: Oct 31 2024
Philadelphia, PA
Bid Date: Apr 08 2025
Spring Ridge, PA
Bid Date: Oct 18 2024
Pittsburgh, PA
Bid Date: Oct 01 2024
Pittsburgh, PA
Bid Date: Oct 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
George Wolf Elementary School HVAC Replacement - Contract 3: Electrical Construction
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.