Published December 19, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Bath, Pennsylvania. Completed plans call for the renovation of a educational facility.

George Wolf Elementary School HVAC Replacement Project in the form of MULTIPLE lump sum contracts. Contract 1: General Construction Contract 2: Mechanical Construction Contract 3: Electrical Construction The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Selective demolition 2. Selective renovations The Work under the Electrical Construction Contract includes all construction and other activities traditionally recognized as electrical work required by any of the Contract Documents including, but not limited to, the electrical drawings, specification Divisions 00, 01, 26, 28, except when specifically assigned to another contract for construction. Work in the Electrical Contract includes, but is not limited to, the following: 1. Demolition of existing electrical systems as noted and required for renovation work. 2. Electrical distribution. 3. Electrical grounding. 4. Lighting and power branch wiring. 5. Communication and systems. 6. Special electrical systems, 7. Electrical connections to equipment furnished under other contracts. 8. Structural supports, hangers, sleeves and inserts. 9. Perform all starting, commissioning, testing, adjusting, balancing and training of all electrical systems and equipment in accordance with the manufacturers' recommendations and in conjunction with the Owner's Commissioning Verification and Testing Agent(s). 10. Luminaires, lighting controls and all accessories. 11. Fire detection and notification systems. 12. Conduits and raceway for special systems as required. 13. Emergency lighting systems. 14. Coordinate work with all contractors including, but not limited to plumbing, general and HVAC contractors. Coordinate and confirm locations and rough-in for all work with all contractors. Make location adjustments as required. 15. Cable tray for all work as specified. 16. Raceways for all work. 17. All rough-in including conduit, pull wire in conduit, and back boxes for all work. 18. Floor and wall boxes for all work. 19. Furnish and install all accessories, hangers, Velcro wraps, etc. 20. Provide electrical dimensions and drawings and assist HVAC Contractor in preparation of coordination drawings. 21. Firestopping of Electrical Contractor Work. 22. Provide equipment and all necessary wiring for interfacing of the following systems: a. HVAC equipment b. Temperature control c. Plumbing equipment d. Gymnasium equipment and operable partitions e. Kitchen equipment f. Motor-operated roller shades g. Theatrical lighting and control systems. 23. 24. The EC is responsible for maintaining power to all areas of the occupied project for all phases of the project. Also see Section 015000 "Temporary Facilities and Controls" for temporary power needs. 25. The EC is responsible for maintaining existing fire alarm system in all Phased areas of construction. 26. Coordinate utility transformer installation and all primary and secondary cable terminations with local utility Question Deadline 10/16/2024 Questions received less than five (5) days prior to the date for opening of Bids may not be answered All questions must be submitted in writing as follows. Phone calls are not permitted. All questions must be sent to: 5.3.1 All questions must be sent to: Chris Haller, (CHaller@chasolutions.com) CHA 5.3.2 All MEP questions must be copied to: Jeff Machik (jmachik@snyderhoffman.com) Snyder Hoffman Associates, Inc.

Bid Results

Educational

$464,628.00

Public - City

Renovation

80

30

14

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Construction Facilities, Sanitary Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Operation Data, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Membrane Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Specialty Casework
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Dies
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
235
Bidding Soon
3,855
All Active Projects
1,758
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 30, 2024

img_map_placeholder

300 Allen St, Bath, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

George Wolf Elementary School HVAC Replacement - Contract 3: Electrical Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.