Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Georgetown, South Carolina. Completed plans call for the renovation of a playground / park / athletic field.
SCDNR is soliciting quotes to& install materials for a check station per the scope of work. Please email BowmanA@dnr.sc.gov for the quote form and scope of work Project Location: Ramsey Grove State Park 1012 Ramsey Grove Rd Georgetown, SC 29440 The contractor shall provide all labor, equipment and materials necessary to provide a fully complete structure in accordance with normally accepted construction practices. The pole building shall be a preengineered building constructed in a manner consistent with "Pole Building" construction and designed for all dead, live, seismic and wind loads as required by the International Building Code, State and Local Codes. Contractor shall provide documentation of building compliance with applicable codes. o One 20'x30' open pole building with roof only, stick built with 6x6 treated posts o Minimum 10'clearance from finished floor to eave. Roof pitch 4/12 o 2x10 band o 2x6 southern yellow pine rafter with 2.5 clips o 2x8 ridge o 1' overhang at eaves o Collar ties every other rafter o 26 ga galvalume (forest green) roofing on 2x4 skirts at 9' height to bottom of band o 25'x40'x4" concrete slab o Posts to be set in 4" concrete slab floor made of fiber reinforced concrete and rebar mesh reinforcement. o Rear portion of the concrete slab (likely approx. 8'x10', exact dimensions to be determined) to be sloped to the center where a drain is to be installed; remainder of slab to be gentle continual slope to facilitate drainage to front. Coordinate dimensions of slope with SCDNR prior to construction. o Floor to have four pieces of 4"x4" (1/8" thick walls) metal tubing installed vertically in the slab and flush with the slab surface. This will be used to accommodate a structure made of 3.5" metal tubing later. Coordinate location and installation with SCDNR prior to installation. o All wood members in contact with the soil shall be treated with a minimum of 0.6 CCA. o All untreated lumber shall be covered with metal trim. o All site preparation shall be performed by the Contractor to provide a smooth, level building site with suitable stability for the slab and building. Site shall be graded to ensure positive drainage around the building. o "Contractor shall provide shop drawings to the SC Department of Natural Resources for approval prior to construction to include foundation, framing, connections, banding, rafter, and wall covering. Construction Cost Range: <50k
Bid Results
Playgrounds / Parks / Athletic Fields
$39,148.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2024
November 13, 2024
1012 Ramsey Grove Rd, Georgetown, SC
Related To This Project
Georgetown, SC
Bid Date: Nov 13 2024
Georgetown, SC
Bid Date: Oct 18 2024
Georgetown, SC
Bid Date: Dec 11 2024
Georgetown, SC
--
Georgetown, SC
Bid Date: Oct 30 2024
Georgetown, SC
Bid Date: Oct 29 2024
Georgetown, SC
Bid Date: Nov 27 2024
Georgetown, SC
Bid Date: Dec 18 2024
Georgetown, SC
Bid Date: Oct 16 2024
Georgetown, SC
Bid Date: Oct 10 2024
Georgetown, SC
Bid Date: Sep 26 2024
Georgetown, SC
Bid Date: Oct 16 2024
Georgetown, SC
Bid Date: Oct 08 2024
Georgetown, SC
Bid Date: Sep 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.