BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Georgetown, South Carolina. Completed plans call for the renovation of a playground / park / athletic field.

SCDNR is soliciting quotes to& install materials for a check station per the scope of work. Please email BowmanA@dnr.sc.gov for the quote form and scope of work Project Location: Ramsey Grove State Park 1012 Ramsey Grove Rd Georgetown, SC 29440 The contractor shall provide all labor, equipment and materials necessary to provide a fully complete structure in accordance with normally accepted construction practices. The pole building shall be a preengineered building constructed in a manner consistent with "Pole Building" construction and designed for all dead, live, seismic and wind loads as required by the International Building Code, State and Local Codes. Contractor shall provide documentation of building compliance with applicable codes. o One 20'x30' open pole building with roof only, stick built with 6x6 treated posts o Minimum 10'clearance from finished floor to eave. Roof pitch 4/12 o 2x10 band o 2x6 southern yellow pine rafter with 2.5 clips o 2x8 ridge o 1' overhang at eaves o Collar ties every other rafter o 26 ga galvalume (forest green) roofing on 2x4 skirts at 9' height to bottom of band o 25'x40'x4" concrete slab o Posts to be set in 4" concrete slab floor made of fiber reinforced concrete and rebar mesh reinforcement. o Rear portion of the concrete slab (likely approx. 8'x10', exact dimensions to be determined) to be sloped to the center where a drain is to be installed; remainder of slab to be gentle continual slope to facilitate drainage to front. Coordinate dimensions of slope with SCDNR prior to construction. o Floor to have four pieces of 4"x4" (1/8" thick walls) metal tubing installed vertically in the slab and flush with the slab surface. This will be used to accommodate a structure made of 3.5" metal tubing later. Coordinate location and installation with SCDNR prior to installation. o All wood members in contact with the soil shall be treated with a minimum of 0.6 CCA. o All untreated lumber shall be covered with metal trim. o All site preparation shall be performed by the Contractor to provide a smooth, level building site with suitable stability for the slab and building. Site shall be graded to ensure positive drainage around the building. o "Contractor shall provide shop drawings to the SC Department of Natural Resources for approval prior to construction to include foundation, framing, connections, banding, rafter, and wall covering. Construction Cost Range: <50k

Post-Bid

Playgrounds / Parks / Athletic Fields

$50,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
53
Bidding Soon
483
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2024

November 13, 2024

img_map_placeholder

1012 Ramsey Grove Rd, Georgetown, SC


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.