BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2025 at 8:00 PM

Updated June 24, 2025

Site work for a water / sewer project in Jersey City, New Jersey. Completed plans call for site work for a water / sewer project.

The existing Berth 10 & 12 is a public berth of approximately 1,050 linear feet located on the South peninsula at Port Newark, typically used to unload heavy dry bulk products, and has been out of service since 2021. The Project would restore Berth 10 & 12 to full operation and with a new wharf structure built to current design standards, including an increased loading capacity, a 75-year design life, and additional capacity for future resiliency investments. The Project provides for (i) demolition of the existing out-of-service berth, including the existing concrete deck, timber piles and bulkhead wall (these components together comprise the wharf structure); and (ii) construction of a new Berth 10 & 12 wharf structure in the same footprint, including a steel pipe-pile supported high- level wharf platform and steel bulkheads, built to meet PANYNJ climate resiliency guidelines and current design standards and codes. The Project aligns with the agencys Port Master Plan, which recommends the consolidation of bulk users in the area upland of Berth 10 & 12, to allow for expansion of container operations throughout the rest of Port Newark South. The Project would be partially funded by a $32 million Port Infrastructure Development Program grant from the U.S. Department of Transportation, which was awarded in 2023. This Industry Briefing follows the Request for Industry Feedback that was issued in September 2024. The Port Authority expects to procure a contractor using a two-step process: a publicly advertised RFQ, followed by shortlisting up to four of the most highly qualified Respondents to the RFQ. Shortlisted Respondents (Proposers) will receive the RFP documents, participate in the RFP process, and compete for the contract. During the RFP phase, the Port Authority intends to host several collaborative dialogue meetings (CDMs) with Proposers prior to the submission of their Proposals. These CDMs will ensure the Proposers understand and have been given the opportunity to comment on the design-build agreement, the technical requirements for the Project, and to propose any innovation solutions for the Project. Should you have any questions reach out to Chase Palmer, Strategic Procurement Advisor with the Port Authority at ropalmer@panynj.gov. The Industry Briefing will be recorded and made available on the Port Authority website for those firms unable to attend the Industry Briefing

Post-Bid

Water / Sewer

$1,500,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
979
Active Projects
426
Bidding Soon
7,645
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

December 3, 2025

Project location map

Multiple Locations, Jersey City, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.