BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2024 at 7:00 PM

Updated December 19, 2024

Site work and new construction of a fire / police facility in Cookeville, Tennessee. Completed plans call for site work for a fire / police facility; and for the construction of a 16,908-square-foot fire / police facility.

This project includes two buildings, approximately 16,908 SF each, at North Washington Avenue & 18th Street and 438 Gould Drive, Cookeville, TN. The work includes but is not limited to building concrete, site concrete, concrete floor finishes, ground and polished concrete, masonry, metals, rough carpentry, casework/tops, insulation, fluid applied weather barriers, metal composite wall panels, cementitious fiber board, sheet metal and flashing, fire stopping, joint sealants, doors, frames, hardware, OH coiling doors, fourfold door systems, aluminum framed entrances and storefront, glazing, gypsum board and framing, acoustical tile ceilings, resilient flooring and base, epoxy floor coating, painting and coatings, plastic toilet compartments, corner guards, toilet accessories, fire protection cabinets, protective coverings, flagpoles, roller shades, plumbing, storm drainage, hvac, electrical, automatic transfer switch, communications, fire alarm, sitework, paving, turf and grasses, seeding, plants, fencing. As of December 18,2024, An architect and a general contractor have been selected. A timeline for construction has yet to be announced. *Subcontractor bidding may be ongoing for select trades. Interested subcontractors should contact the awarded general contractor to check on available bidding opportunities.

Post-Bid

Fire / Police

$719,418.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
1
Bidding Soon
618
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2024

November 15, 2024

Project location map

45 E Broad St, Cookeville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.