Published November 23, 2024 at 7:00 PM

Updated November 27, 2024

Renovation of a mixed-use development in Shelbyville, Tennessee. Completed plans call for the renovation of a educational facility.

https://midhudsonnews.com/2024/11/12/poughkeepsie-schools-create-new-capital-project-fund/ Poughkeepsie schools create new capital project fund POUGHKEEPSIE – The Poughkeepsie City School District Board of Education (BOE) recently approved the creation of a $12 million capital reserve fund to complement existing capital improvement projects and future projects including the Jane Bolin Building Project. The $12 million fund, according to the district, will translate to approximately $30 million in building upgrades, depending on the application of state aid, and will help fund the ongoing Strong Schools Equal Strong Communities Capital Improvement Project. The fund was created by combining various unassigned excess funds without taking money away from any existing programs, projects, or services. The district is currently making more than $120 million in improvements and construction to improve the safety of district buildings and upgrade the facilities. Future district plans include the creation of innovation labs in school buildings, renovating the high and middle schools’ auditoriums, and repairing the middle school pool. “We’re transforming our schools into 21st-century learning environments to elevate and encourage student success for years to come,” Dr. Eric Jay Rosser, superintendent of schools, said. -------------- THE POUGHKEEPSIE CITY SCHOOL DISTRICT INVITES BIDS FOR "POUGHKEEPSIE CSD - PHASE 3 BUILDING IMPROVEMENTS" PROJECT. 1.01 PROJECT INFORMATION A. Project Identification: Poughkeepsie CSD - Phase 3 Building Improvements 1. Project Location(s): a. Poughkeepsie High School, 70 Forbus Street, Poughkeepsie, New York 12601. b. Poughkeepsie Middle School, 55 College Avenue, Poughkeepsie, NY 12601. c. Krieger Elementary School, 265 Hooker Avenue, Poughkeepsie, NY 12601. d. Warring Elementary School, 283 Mansion Street, Poughkeepsie, NY 12601. e. Early Learning Center, 372 Church Street, Poughkeepsie, NY 12601. f. Morse Elementary School, 101 Mansion Street, Poughkeepsie, NY 12601. g. Clinton Elementary School, 100 Montgomery Street, Poughkeepsie, NY 12601. B. Owner: Poughkeepsie City School District, 18 S. Perry Street, Poughkeepsie, NY 12601. 1. Owner's Representative: a. Marcos Rodriguez b. PH: 845-905-6809 C. Architect/Engineer: CPL, at 26 IBM Road, Poughkeepsie, NY 12601. 1. Project Manager: Allison Sawyer asawyer@cplteam.com 2. Project Admin: Jamie Moore jmoore@cplteam.com D. Construction Manager: Triton Construction - 1279 State Route 300, 1st Floor, Newburgh, NY 12550 1. Construction Manager's Representative: a. John Hansen b. PH: 516-427-3160 E. Project Description: Project consists of building improvements including, but not limited to, mechanical improvements, innovation labs and other ADA improvements as described in the Contract Documents. F. Construction Contract(s): Bids will be received for the following Work: 1. Multiple Contract Project consisting of the following prime contracts: a. Contract EC-1: Electrical Construction: CES, WES, MES, KES, ELC b. Contract EC-2: Electrical Construction: PMS c. Contract EC-3: Electrical Construction: PHS d. Contract GC-2: General Construction: CES, WES, MES, KES, ELC (note GC-1 contract previously awarded) e. Contract GC-3: General Construction: PMS & PHS f. Contract MC-2: Mechanical Construction: CES,WES,MES,KES,ELC (note MC-1 contract previously awarded) g. Contract MC-3: Mechanical Construction: PMS h. Contract MC-4: Mechanical Construction: PHS i. Contract PC-1: Plumbing Construction: CES,WES,MES,KES 1.02 BID SECURITY A. Bid security shall be submitted with each bid in an amount not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the "Instructions to Bidders". 1.03 DOCUMENTS A. All bid addenda will be transmitted to registered plan holders via email and will be available at website. Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. B. A Bidder, upon 1) making the deposit required for the Bid Documents, 2) submitting a Proposal accompanied by the required bid security, and 3) returning the plans and specifications used by such Bidder in good condition within thirty (30) days following the award of the Contract, or rejection of the Bid, shall have returned to them the full amount of the deposit for one copy of the plans and specifications. 1.04 TIME OF COMPLETION A. Successful bidder shall begin the Work upon receipt of the Notice to Proceed and shall complete the Work within the Contract Time. 1.05 BIDDER'S QUALIFICATIONS A. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder. 1.06 NOTIFICATION A. Attention of the Bidder is particularly called to the Owner's sales tax exemption, the requirements as to conditions of employment to be observed, and the minimum wage rates to be paid under the Contract. In addition, the Bidding Documents contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements, bank references, lists of lawsuits, arbitrations or other proceedings in which the Bidder has been named as a party, a statement of surety's intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder. B. Bids shall be prepared as set forth in "Instructions to Bidders", enclosed in a sealed envelope bearing on its face the name and address of the Bidder and the title of the Work to which the bid enclosed relates. C. No bids may be withdrawn for a period of forty-five (45) days after opening of bids. 1.07 AWARD OF BIDS A. The Poughkeepsie City School District hereby reserves the right to waive any informalities and reject any, or all, Bids or to accept the one that, in its judgement, will be in the best interest of Poughkeepsie City School District. B. The Owner further reserves its right to disqualify Bidders for any material failure to comply with the "Instructions to Bidders".

Post-Bid

Educational

$2,310,000.00

Public - City

Renovation

176

25

7

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Construction Aids, Vehicular Access and Parking, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Structural Panels, Sheathing, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Static-Control Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Clocks, Rugs and Mats, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Rainwater Leaders, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Centrifugal HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Instrumentation and Terminal Devices, Integrated Automation Instrumentation and Terminal Devices for HVAC, Integrated Automation Control Dampers, Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
97
Bidding Soon
1,368
All Active Projects
623
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

December 30, 2024

img_map_placeholder

Multiple Locations, Shelbyville, TN