BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Renovation of a municipal facility in Lakewood, Colorado. Completed plans call for the renovation of a municipal facility.

This project is for the design and ion of office and office related space at the existing building 50 at the Denver Federal Center campus in Lakewood, Colorado. *To obtain additional project-related documentation please complete the attached CUI form and create a GACA account by following the provided instructions. Once both are complete, please joseph.dorseygsa.gov and jamie.pottergsa.gov your completed CUI form along with your GACA address so we can grant you acess to the additional files* The and Contract This procurement is being conducted using the two phase selection process found in FAR 36.3. Qualification proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two. One contract will be awarded using competitive negotiation. In Phase 1, GSA will select a short list of the most highly qualified offerors and request that those offerors submit Phase 2 proposals. All responsible sources may submit a Phase 1 proposal. A maximum of 3 firms will be selected to submit Phase 2 proposals. Only those selected offerors are authorized to submit Phase 2 proposals. Those offerors not selected for participation in Phase 2 will be notified in accordance with FAR 15.503(a). This is for Small Businesses, in accordance with FAR 19. This sets forth requirements for Phase 1 qualifications proposals and the evaluation factors for Phase 2 proposals for a Contract to the Project. Proposals conforming to the requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein Neither the nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer. Pre-Proposal Conference Date: May 7, 2025 Time: 9:00 AM MT Location: Denver Federal Center Building 50 (West 6th Avenue and Kipling Street Lakewood, CO 80225) Estimated Price Range The estimated price range for the Project is between 5,000,000 and 10,000,000. Regarding Phase 1 Submit all regarding the Phase 1 to joseph.dorseygsa.gov and jamie.pottergsa.gov on or before May 14, 2025. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the . Receipt of Qualifications In order to be considered for Phase 2 and award, Phase 1 qualifications proposals conforming to the requirements of the must be received 2:00 pm MT on the following date and at the following address. Date: May 28, 2025 Address: joseph.dorseygsa.gov, jamie.pottergsa.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Municipal

$10,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
67
Bidding Soon
1,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

February 12, 2026

Project location map

West 6th Avenue and Kipling St, Lakewood, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.