BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2024 at 8:00 PM

Updated October 5, 2024

This is a service / maintenance or supply contract in Snohomish, Washington. Contact the soliciting agency for additional information.

City of Snohomish Request for Qualifications Professional Services for First Street Master Plan The City of Snohomish requests statements of qualifications from qualified consultants to provide planning and design services for the First Street Master Plan, with a focus on Historic Downtown Snohomish. Initial findings and design options have been developed by students from the University of Washington Urban Planning program will serve as a foundational starting point for this project. The consultant's responsibilities will include further developing the comprehensive master plan, facilitating public meetings, conducting topographic survey, and preparing preliminary cost estimate. This project area spans the First Street from Avenue J to Lincoln Avenue, encompassing historic buildings, pedestrian walkways, parking areas, utility upgrades (sewer, water, and storm), street lighting, and public spaces. The master plan will aim to preserve the historic character while enhancing safety, functionality and accessibility. All services must be performed or supervised by person appropriately licensed and registered under Washington State laws governing the practice Project Tasks Project tasks shall include, but are not limited to: 1. Review of site and existing information, including the University of Washington Urban Planning Student Concept Project. 2. Develop master plan a. Identify distinct sections based on zoning characteristics and needs, and create a cohesive master plan. i. Phase 1: Avenue D to Maple Avenue 1. Incorporate connections to Kla Ha Ya Park and Cady Landing. 2. Activate the gazebo space at the south end of Avenue A and enhance pedestrian improvements. ii. Phase 2: Avenue J to Avenue D 1. Improve pedestrian corridors and expand/improve parking. 2. Plan for and connect to the future park at the existing City Operations and Maintenance site (1801 First Street). 3. Establish a connection to the Riverview Wildlife Refuge Trail. iii. Phase 3: Maple Avenue to Lincoln Avenue 1. Ensure pedestrian connectivity to existing and proposed non-motorized networks. 3. Attend and develop materials for public outreach meetings. 4. Topographic survey. 5. Historic Building Inventory and Cultural Resources assessment. 6. Develop planning level cost estimate. 7. Provide assistance with permitting processes. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
97
Bidding Soon
1,438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2025

Project location map

1st St, Snohomish, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.