BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a mixed-use development in Farmington, Missouri. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Scope of Work includes sidewalk improvements to Highway H within the City of Farmington and provides for concrete sidewalks and ADA ramps, concrete approach, concrete curb and gutter, storm sewer improvements, pavement striping, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Farmington, Missouri anticipates issuing notice to proceed in the early spring of 2025, weather permitting. For a contractor to be awarded this project the contractor must have a fully responsive contractor questionnaire on file with the Missouri Highway and Transportation Commission at least 7 days prior to the bid opening date. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the 2023 Missouri Standard Specifications for Highway Construction. No Second Tier Subcontracting will be allowed. Any questions regarding this project must be submitted to: mspalding@cochraneng.com, by 4:00 pm local time on October 29, 2024. No written questions after this date or any verbal questions will be recognized. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. The DBE Contract Goal for this project is 5%, and DBE firms must be certified by MoDOT to attain credit towards this contract goal. There is no On-the-Job Trainee goal. The Owner Intends to Award the Contract to the Lowest, Responsive, Responsible Bidder. The Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in The Best Interest of the Owner With Modots Consent. MODOT - Highway H Sidewalk Improvements

Bid Results

Sidewalks / Parking Lot

$689,154.00

Public - City

Paving, Site Work

109

14

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
50
Bidding Soon
789
All Active Projects
285
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

December 5, 2024

img_map_placeholder

Hwy H, Farmington, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.