BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a water / sewer project in New Brunswick, New Jersey. Completed plans call for site work for a water / sewer project.

This Project Includes the Installation of Approximately 2,200 Lf of Water Mains Along the Section of Pennington Road Between Tunison Road and Voorhees Road and Installation of Mains Along Antile Road Within the City. the Scope of Work Includes Various Improvements of Water Mains Through the Construction of New 8-inch and 12-inch Ductile Iron Pipe Class 52 Potable Water Mains Along With Fittings, Service Connections and Components. This New Water Main System Shall Connect to the Existing Infrastructure Which Currently Operates Throughout the City. The Bidders Shall Provide All Material and Labor Necessary to Perform the Installation as Per the Construction Documents and Specifications. Site Work Scope Includes Various Traffic Control Devices, Clearing Site, Soil Erosion and Sediment Control Measures, Excavation, Restoration of Asphalt Pavement, Various Driveway Restorations, Curb Restoration, and Landscape Restorations. the Project Includes a Specialty Crossing of Large Diameter Pse&g Co. And Williams-transco Natural Gas Transmission Mains. The Contractor Shall Be Solely Responsible to Investigate the Conditions and Nature of the Crossing Areas for All Gas and Petroleum Pipeline Crossing Items Within the Project Area as Indicated Within the Plans. The Contractor Shall Be Prepared to Conduct Test Pits at Each of the Existing Mains Within the R.o.w. No Machine Excavation is Permitted Within 24" of Existing Pipelines Within the R.o.w.; Soft Dig Methods Are Required by the Governing Authorities of the R.o.w. At a Greater Distance Than 24". Question Deadline 05/28/2025 Every request for such interpretation should be asked through the Question and Answer feature for the project at Online. must be received at least ten (10) business days prior to the date fixed for the opening of bids. A Certified Check or Cashier's Check Made Payable to the Order of the City of New Brunswick, or a Duly Executed Bid Bond, in the Amount of Ten Percent (10%) of Each Bid, but in No Case in Excess of $20,000.00 Must Be Deposited by the Bidder Together With a Surety Consent Evidencing That They Can Obtain the Required Performance Bond. the Successful Bidder Will Be Required to Deliver to the Owner an Executed Performance Bond and Payment Bond of a Responsible Indemnity Company Authorized to Do Business in the State of New Jersey. the Contract Will Allow 120 Calendar Days for Completion of the Work From the Notice to Proceed

Award

Water / Sewer

$863,525.00

Public - City

Site Work

12

8

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,019
Active Projects
453
Bidding Soon
7,479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

July 11, 2025

Project location map

Multiple Locations, New Brunswick, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.