Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 16, 2024 at 8:00 PM
Updated October 18, 2024
Renovation of a warehouse / distribution facility in Walker, Michigan. Completed plans call for the renovation of a warehouse / distribution facility.
The scope of work involves the replacement and installation of a commercial shingled roof on the City of Walker salt storage building. The project includes all necessary materials, labor, and equipment to complete the work in accordance with the specifications outlined below 1. Remove and dispose of existing roofing material (if applicable). 2. Protect all landscaping and existing features designated to remain. 3. Ensure safe and clear access for all workmen and equipment. 4. Inspect and repair or replace damaged decking as needed. 5. Ensure decking is clean, dry and properly aligned. 6. Furnish and install new underlayment as required for the term of warranty 30 and alternate for 20- year design. 7. Furnish and install Base Bid of a new Architectural Asphalt Shingles with all flashings and details complete for a 30-year labor and material warranty. Note option for 20-year. 8. Ensure proper alignment, nailing pattern and overlap of shingles. 9. Furnish and install new aluminum flashing around all roof penetrations and intersections. 10. Install ice and water shield two-course all around including drip edge and roof cement and sealants. 11. Remove and eliminate fiberglass skylights. 12. Perform a thorough inspection of the roof installation at various stages. 13. Ensure all work complies with local building codes and manufacturer's specifications. The contractor must be licensed with the City of Walker. Contractor will also include a copy of liability insurance, naming the City of Walker as an additional insured. Work shall be completed by 06/30/2025 with work taking place between the dates of 10/04/2024 until 11/15/2024 OR 04/01/2025 until 06/30/2025 unless otherwise stated. if you have additional questions, please contact the Department of Public Works at (616) 791-6854 submitting this Proposal, it is understood that the right is reserved by the City of Walker to reject any or all Proposals and to waive any irregularities in bidding.
Award
Warehouse / Distribution
$54,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2024
October 4, 2024
To Be Determined, Walker, MI
Related To This Project
Walker, MI
Bid Date: Oct 15 2024
Walker, MI
Bid Date: Oct 15 2024
Walker, MI
Bid Date: Oct 03 2024
Walker, MI
Bid Date: Oct 29 2024
Walker, MI
--
Walker, MI
Bid Date: Dec 11 2024
Walker, MI
Bid Date: Oct 07 2025
Walker, MI
Bid Date: Oct 08 2024
Walker, MI
Bid Date: Oct 01 2024
Walker, MI
Bid Date: Jul 02 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed