Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 26, 2024 at 7:00 PM

Updated December 27, 2024

Site work for a water / sewer project in Elberton, Georgia. Working plans call for site work for a water / sewer project.

**As of December 26 , 2024 , this project has been cancelled and no definite date for the rebid.** The work consists of installing approximately 700 LF of 8" PVC gravity sewer, 75 LF of 6" PVC gravity sewer, and 125 LF of boring and jacking steel casing pipe. The work also includes miscellaneous improvements, and all necessary materials, labor, equipment, and associated appurtenances required for completion of the work. All questions regarding the project and bid documents must be submitted electronically to the Engineer's office. Contractors should send their questions in writing to Tiffany Barry at tbarry@pandqinc.com. Please note that all questions must be submitted by the end of the day on October 21, 2024 The Scope of Work as described herein is defined as "utility contracting" in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a "Utility Contractor" and must also employ a "Utility Manager" certification holder who will have oversight of all the work. Contractor submitting a bid must list the license number of the Contractor performing the utility contracting on the Bid form and provide proof of a valid license. See Instruction to Bidders for additional requirements. Bids shall be accompanied by a Bid Bond or a certified cashier's check, the value of which should not be less than five percent (5%) of the overall bid amount. All bonds must be countersigned by a Georgia Resident Agent and should be submitted with a corresponding "Power of Attorney." The successful bidder is required to provide both a Performance Bond and Payment Bond, each in an amount equal to one hundred percent (100%) of the awarded Contract amount. The project is scheduled to be completed within the contract time of 60 days. The entire scope of work will be awarded as a single contract. Payment for the work will be disbursed at regular intervals, contingent upon the submission of the Contractor's Applications for Payment, which will be reviewed and approved by the Engineer Owner reserves the right to delay the award of the Contract for a period not to exceed sixty (60) days from the date of opening of the bids, during which time bids shall remain open and not subject to withdrawal. Owner reserves the right to reject any and all bids and to waive any technicalities or irregularities and to award the bid based on the highest and best interests of the City.

Final Planning

Water / Sewer

$300,000.00

Public - City

Site Work

7

12

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
118
Bidding Soon
1,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

June 10, 2025

Project location map

Athens Tech Dr, Elberton, GA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed