BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2024 at 8:00 PM

Updated October 31, 2024

This is a service / maintenance or supply contract in Newport, Oregon. Contact the soliciting agency for additional information.

for the following: Manufacturer is to design and build, (8) eight over a three year contract, 12.5 kV, three phase solid dielectric reclosers and controls to Central Lincoln specifications. The area units will be installed is subject to coastal (salt fog) conditions, there for all specifications must be met. This contract will be a three year contract starting July 1, 2024 and ending on June 30, 2027. Each party will have the option to terminate this contract at any time with a 30 day written notice. All manufacturers must be pre-approved prior to the bid opening. At the above date, time and place the District will publicly open bids. In order for a bid to be accepted and considered for award of a contract, the submitted bids must comply with Oregon Revised Statutes (ORS) regulating contract work for people's utility districts. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120. The District may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the District if it is in the public interest to do so.

Post-Bid

Power Plant

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
46
Bidding Soon
874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

Project location map

Multiple Locations, Newport, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.