BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Pineville, North Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

A sidewalk with 2'-6" concrete curb and gutter is proposed on the west side of South Polk Street, beginning at Lowry Street, and ending at the existing sidewalk near Town Centre Blvd (approximately 450 linear feet). Storm drainage improvements will be designed as necessary to convey runoff. This proposal assumes the typical curb and sidewalk section will not have adequate area to remain in the existing right of way and will require disturbance of the adjacent embankment. Additional right-of-way, retaining wall design, and major utility relocation may be required to install the proposed sidewalk. Adjustments to the intersection signalization will be required to accommodate pedestrian crossing of Lowry Street to the new sidewalk. Deadline for all Questions October 7, 2024. Qualifications packages should be addressed to: Director of Public Works 505 Main Street Pineville, NC 28134. Clarification of Submittal The Town reserves the right to obtain clarification of any point in a firm's proposal or to obtain additional information. The town reserves the right to reject any or all responses to the RFQ, to advertise for new responses, or to accept any responses deemed to be in the best interest of the town. The town reserves the right to waive technicalities and informalities.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

3

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
71
Bidding Soon
1,221
All Active Projects
533
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

November 8, 2024

img_map_placeholder

S Polk St, Pineville, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.