EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 25, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Berwyn, Pennsylvania. Completed plans call for the renovation of a educational facility.

As of November 25, 2024, project was awarded to the following: DK Construction Services - $58,000.00 (EC) Clipper Pipe & Services, Inc. $181,000.00 (Plumbing) Hirschberg Mechanical $714,400.00 (MC) Donald E. Reisinger, Inc. $114,125.00 (GC), with total awarded of $1,067,525. Bid Package 1 - HVAC Renovations and Upgrades at Beaumont Elementary School (BES), New Eagle Elementary School (NEES), Tredyffrin/Easttown Middle School (TEMS), and Conestoga High School (CHS) (Project # 24-003.01) The project consists of mechanical renovations and upgrades, and associated miscellaneous electrical, plumbing and general trades work at Beaumont Elementary School (BES), New Eagle Elementary School (NEES), Tredyffrin/Easttown Middle School (TEMS), and Conestoga High School (CHS). Work includes mechanical equipment replacement at BES, NEES, and TEMS; Sanitary line replacement at NEES; Domestic hot and cold-water piping at CHS; and duct cleaning at BES and NEES. The Board of School Directors reserves the right to reject any or all bids and to waive errors or technical defects in the bid or bid forms. Questions regarding this project shall be submitted via online. Location- Beaumont Elementary School , 575 Beaumont Road Berwyn, PA 19312 New Eagle Elementary School , 507 Pugh Road Berwyn, PA 19312 Wayne, PA 19087 Tredyffrin/Easttown Middle School , 801 Conestoga Road Berwyn, PA 19312 Conestoga High School , 200 Irish Road Berwyn, PA 19312 1. Construction Phasing and Sequencing: a. Working hours and dates: Refer to the Division 0 and 1 specifications for all details and requirements. b. Any and all power outages for normal electrical systems in the buildings shall occur Monday thru Friday and shall be requested in writing to the Owner a minimum of 14 days in advance. c. There will be additional summer 2025 work in BES, NEES, TEMS and CHS under a separate project contract. Coordinate with these Contractors for power outages. 2. Demolish electrical conduit, wiring and equipment as shown on the drawings, as required in these specifications and as required to accommodate the new and renovation construction activities and the required construction phasing to allow the Owner to occupy the building during construction. Remove wiring back to the respective source for all associated equipment indicated to be demolished and maintain the electrical circuit integrity as required for equipment to remain. Remove exposed conduit back to the respective source for all associated equipment indicated to be demolished - cut, cap and label conduits that are embedded in permanent walls and floors; provide cutting and patching of the same. 3. For detailed scope of work for each electrical system, refer to the respective Division 26 specification sections. 4. Relocate devices as shown on the plans. 5. Provide and install new light fixtures and controls. 6. Provide new wall mounted 0-10V lighting dimmer switches and associated low-voltage and branch circuit wiring to each associated fixture. 7. Provide and install retrofit breakers in existing panelboards and distribution panels. For new circuit breakers to be retrofitted in the existing panelboards, contractor shall survey the existing panel, determine the manufacturer and ratings of the existing breakers and provide new breakers to match and that are retrofittable into the panelboard and have ratings to match the existing breakers. 8. Provide and install new wiring devices and backboxes. 9. Remove and reinstall lighting and other ceiling devices to accommodate new ceiling. 10. Relocate receptacles and data jacks as required to accommodate new piping enclosures. 11. Provide and install fused or non-fused disconnect switches, or circuit breakers at the various pieces of equipment as required by the N.E.C. Code. 12. Remove, reinstall and relocate or provide new Fire Alarm equipment, including re-programming of the system. Contractor shall re-test fire alarm system (components demolished, relocated and/or new in this project) in accordance with NFPA 72. 13. Provide patching, painting and sealing of all interior openings created by demolishing any equipment or conduit. 14. Adjust connections to electrical motors to insure proper rotation. 15. Provide and install wiring and final connections to all equipment in Mechanical specifications and drawings requiring electrical service. 16. Contractor shall include all required overtime in his bid; the Owner will not provide additional compensation to the Contractor for work performed outside of normal working hours in order to complete the project per schedule and per the required construction phasing and sequencing requirements. 17. Testing and balancing of Electrical system. 18. All necessary rigging. 19. Removal of trash and general clean-up. 20. All necessary permits, approvals, fees, etc. Bid results - GC - Donald E. Reisinge, Inc- $114,125.00 MC - Hirschberg Mechanical - $714,400.00 Plumbing - Clipper Pipe & Service Inc - $181,000.00 EC - DK CONSTRUCTION SERVICES, LL - $58,000.00

Award

Educational

$1,067,525.00

Public - County

Renovation

49

14

21

8

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Other Specialties, Pest Control Devices
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Nonmetal Ducts, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Furnaces
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
229
Bidding Soon
3,540
All Active Projects
1,715
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

December 5, 2024

img_map_placeholder

Multiple Locations, Berwyn, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bid Package 1 - HVAC Renovations and Upgrades at BES, NEES, TEMS, & CHS

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.