EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 21, 2024 at 7:00 PM

Updated October 1, 2024

Site work, paving, outdoor lighting and new construction of a playground / park / athletic field in Scotch Plains, New Jersey. Completed plans call for site work for a six-acre playground / park / athletic field; for paving for a 20-space playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and for the construction of a playground / park / athletic field.

Scope includes but is not limited to: Restroom Building, Parking Lot (20 Spaces), Shaded Area, Small Playground, Open Play Area, Splash Pad, Covered Pavilion, Gravel / Stone Dust Walkway, Site Lighting, The Union County Improvement Authority (the "Authority") has issued a Request for Bids (the "RFB") soliciting Bids from qualified entities ("Bidder(s)") for improvements to Glenside Avenue Park Bids must be enclosed in a sealed envelope, bearing the name and address of the Bidder and labeled "GLENSIDE AVENUE PARK IMPROVEMENTS". If the Bidder has any questions or finds any perceived error or omission in the RFB or any conflict or discrepancy within the RFB, the Bidder shall submit a written Request for Information ("RFI") to the Authority for interpretation or clarification. The Bidder shall be responsible for delivery of all such RFIs to Dr. Bibi Taylor, Executive Director at btaylorUCIA@ucnj.org, Joseph R. Venezia, P.E., P.P, CME, Principal/Municipal, Colliers Engineering & Design, via e-mail to joseph.venezia@collierseng.com, Rosie Bialoblocki, Project Services Coordinator, Colliers Engineering & Design, via email to rosie.bialoblocki@collierseng.com, and Troy Marzziotti at tmarzziotti@mastconstruction.com, no later than November 4, 2024 at 4:00pm. No oral interpretations and responses will be made. Responses to all RFI will be made by Addenda no later than November 7, 2024. The RFB constitutes an invitation to submit Bids to the Authority, and does not represent an offer, obligation or agreement on the part of the Authority. The Authority reserves the right to (i) reject any Bid in accordance with N.J.S.A. 40A:11-13.2 and any Bid that is deemed not responsible in accordance with law; and (ii) to waive minor immaterial informalities or technical errors in accordance with law. Bids must be prepared and submitted in the manner set forth in the RFB. The Authority also reserves the right to make modifications or additions to the RFB prior to the Bid submission date. To the extent the Authority, in its sole discretion, determines to amend, modify, supplement, revoke or alter any other material term or condition of the RFB, including, without limitation, the procurement process or the criteria for award, which rights are hereby expressly reserved to the Authority, the Authority will communicate any such change in an Addenda in accordance with N.J.S.A. 40A:11-23c.2, no later than seven (7) days, Saturdays, Sundays, or holidays excepted, prior to the date for acceptance of Bids, to any person who has submitted a Bid or who has received a bid package by certified facsimile transmission. This Project is being funded partially through State and Federal Grants awarded by the State of New Jersey. The Federal Grant funding is through the Coronavirus State Fiscal Recovery Fund-G2023-79 under the American Rescue Plan Act of 2021, P.L. 117-2, as amended. Consequently, this RFB and the Contract involved includes and incorporates the contract requirements under Federal funding procurement awards in accordance with 2 CFR Part 200 Appendix II. By submitting a Bid, each Bidder, without any other act, acknowledges and agrees to comply with each of the terms and conditions of the RFB. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq. As a result of the partial Federal funding involved with the Project, Bidders and their subcontractors must also be able to provide a Unique Entity ID (UEI) from Sam.Gov (the System of Award Management) and must maintain an active SAM registration through Final Completion of the Project. Please consult SAM.gov for more information or if you have questions about obtaining an UEI. The Authority will award a contract or reject all Bids within sixty (60) days after receipt of the Bids unless otherwise agreed by the parties in accordance with applicable law. Any inconsistency between this notice and the RFB shall be governed by the terms of the RFB.

Post-Bid

Playgrounds / Parks / Athletic Fields

$3,750,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

53

29

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment, Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Metal Roof Panels, Composite Wall Panels, Siding, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Roof Windows and Skylights, Unit Skylights, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Quarry Tiling, Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Facility Water Distribution Piping, Domestic Water Piping, Facility Potable-Water Storage Tanks, Facility Roof-Mounted, Potable-Water Storage Tanks, Facility Sanitary Sewerage, Facility Sanitary Sewers, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Schedules for Electrical, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
308
Bidding Soon
5,437
All Active Projects
2,206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 23, 2024

img_map_placeholder

175 Glenside Ave, Scotch Plains, NJ

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Glenside Avenue Park Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.