Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Gorham, Maine. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
Location :The Buck Street Large Culvert Replacement is located along Buck Street in Gorham, Maine at the Douglas Brook Crossing. Outline of Work The work includes: Replacement of an existing deteriorating culvert with a 19.5' Span X 8' Rise X 72' Length Precast Concrete Box Culvert with a simulated streambed material in order to allow for sufficient fish passage through this crossing. The installation of this culvert will include; excavation, installation of culvert and related backfill, gravels, base and surface pavements. Basis of Award The Town will award the bid to the lowest responsible and responsive bidder who demonstrates the ability to provide the services outlined in this Invitation to Bid and who submits a bid that responds to the various criteria set forth herein, in the best interests of the Town. In determining the most advantageous bid, the Town reserves the right to consider the bidder's references, experience of the bidder generally, and past and present experience of the Town with the bidder, in addition to price. Other Information: The contract shall make note of the schedule requirements presented in the contract documents. The Town would like to begin construction of the project in 2025 with completion of the work in its entirety by October 18, 2025. The Contract Documents may be examined at the following locations: 1. Sebago Technics, Inc., 75 John Roberts Road, Suite 4A, South Portland, ME 04106 The Issuing Office is Sebago Technics, 75 John Roberts Road, Suite 4A, South Portland, ME 04106.Checks should be made payable to SEBAGO TECHNICS. Credit cards will not be accepted. To be considered a responsive Bidder, the Contractor shall have obtained plans and specifications either electronically (PDF format) or hard copy from the Engineer (Sebago Technics). A link to download the plans may be obtained by contacting Shane Kelly at skelly@sebagotechnics.com or 207-200-2078. The Bid will not be awarded to a Bidder unless a record for obtaining documents from the Engineer exists in the office of the Engineer All questions are to be submitted to Engineer in writing. Questions may be transmitted by e-mail to skelly@sebagotechnics.com. Questions received less than 5 working days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. A completed Bid Form, Bid Security, Experience and Qualifications Statement with verification of bonding capacity and other attachments identified in the instructions must be submitted with the Bid. The Town reserves the right to waive any formalities, to reject any or all bids, to accept a bid or section(s) of a bid and to negotiate a revised scope of services and/or fees should it be deemed in the best interest of the Town to do so. The Town reserves the right to reject any or all bids, to evaluate bids, to waive any formality or technicality in the submissions, to negotiate with any bidder, and to accept any bid or section(s) of a bid deemed to be in the best interests of the Town. A bid must be accompanied by the Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form of a certified check or Bid bond issued by surety meeting the requirements of the General Conditions. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the Owner. Within five days after the receipt of bids, the apparent low responsive bidder shall deliver to the Engineer and Owner for review and acceptance the listing of subcontractors, suppliers or entities for the work listed in Supplementary Condition SC-7.06. The successful bidder must furnish within 10 calendar days after the Notice of Award the required number of copies of the signed Agreement, 100% Performance Bond, 100% Payment Bond, Insurance Policy and begin execution of this contract within 10 calendar days following the Notice to Proceed. The General Contractor shall be responsible for the full amount the 100% Performance Bond and the 100% Payment Bonds. Combining bonds of subcontractors is not acceptable.
Post-Bid
Bridges / Tunnels
$600,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2024
January 1, 2025
Buck St, Gorham, ME
Related To This Project
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
Bid Date: May 01 2024
Gorham, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.