EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 18, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Muskego, Wisconsin. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

Idle Isle Park Improvements. Site Address: W182S6666 Hardtke Dr Site Directions: Idle Isle Park Description: The project involves asphaltic pavement, mill and overlay, concrete pavement, pavement markings, grading, asphalt seal coating, and removal and restoration of a boat launch. All work is included in a single prime contract. 1. Sawcut full depth at locations called out on the plans. 2. Remove all existing pavement as called out on the plans, average pavement thickness varies. Contractor shall remove any additional stone material to achieve proposed pavement thickness. 3. Contractor to properly dispose of pavement and material offsite. 4. Remove and haul off-site and legally disposing of all vegetation and material through Common Excavation to reach required pavement thickness with 8 inches of 1 - 1/4 " crushed limestone. 5. Contractor to haul all removed topsoil to City of Muskego DPW yard. 6. Install, compact, proof roll, shape, and grade stone material per plan consisting of 8" of 1-1/4" aggregate base course to match existing drainage patterns. 7. Install 4-inch asphalt binder course layer (4 LT 58-28 S, 12.5mm) over entire section per plans. 8. Install 2-inch asphalt surface course (5 LT 58-28 S, 9.5mm) over entire section per plan. 9. Install 8-inch concrete pavement in areas shown on the plans. 10. Seal coat all areas on the plans called out for seal coating. 11. Install all parking lot pavement striping and proposed signs.

Bid Results

Playgrounds / Parks / Athletic Fields

$145,165.00

Public - City

Paving, Site Work

12

10

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
115
Bidding Soon
1,939
All Active Projects
967
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

November 8, 2024

img_map_placeholder

W182S6666 Hardtke Dr, Muskego, WI

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Idle Isle Park Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.