Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a power facility in Bourne, Massachusetts. Conceptual plans call for site work for a power facility.
The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement for Construction Services of a Power Generation Microgrid at CCSFS in Bourne, MA. This announcement is to determine interest, availability, and capability of Small Business and Large Business concerns for this project. The NAICS code for this procurement is 237130. The project is planned to be issued in the Summer of 2026 with construction to begin in the Fall of 2026. The estimated construction cost is between $100,000,000 - $250,000,000. The project will be constructed within the extents of CCSFS with significant portions of work taking place in facilities located in a secured area. The impacted facilities are to remain occupied during construction with minimal disruption to operations requiring precise construction phasing. Work for this project will likely include, but not be limited to, the following: Demolition of electrical systems serving existing power plant such as primary and secondary service feeds, transformers, switchgears, and back-up diesel generators. Installation of 480V infrastructure to serve power plant features such as all new primary and secondary electrical components (total 8 megawatts) to include new back-up power generation equipment (i.e., diesel generators, uninterrupted power supplies, and battery energy storage systems). Site improvements consist of new primary and secondary electrical duct banks throughout site. Installation or repair of electromagnetic shielding systems. Incorporation of renewable energy technologies into existing power grid (i.e., wind or solar). Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience in performing the work components stated above. Please include up to three specific examples of the firm's experience performing the work requirements stated above. The projects must have been performed within the last seven years. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, which will be used to support the offeror's effort and their experience must also have been performed within the last seven years. Proof of bonding capability is required. Additionally, please comment on the use of a Project Labor Agreement (PLA). A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Agencies may use PLAs to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 14063, Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, agencies are required to use project labor agreements in large-scale construction projects to promote economy and efficiency in the administration and completion of Federal construction projects, unless waived by a senior official. The use of a PLA applies to both small and large businesses and is appropriate if the use of project labor agreements will: Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement Clause 52.222-34 Project Labor Agreement. Some of the factors that may be considered regarding PLA use are: The involvement of multiple contractors and/or subcontractors working in multiple crafts or trades. The complexity of the project. Shortage of skilled labor in the region. Completion of the project will require an extended period of time. The use of PLAs on other comparable projects in this geographic area. The promotion of the Governments long term programs interests such as training of skilled workforce for future projects. The possibility of labor disputes that threaten timely completion. Additional costs from use of PLAs may be cost prohibitive. In consideration of the above factors, and any others which may be deemed appropriate, firms are invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions: Should a PLA be executed on the above project What benefits do you believe a PLA could achieve What other factors should the Corps consider before deciding to include PLA provisions for the construction project Will the use of a PLA be effective in achieving economy and efficiency If so, how What is the estimated relative cost impact, or any other economies or efficiencies derived by the Federal Government, if using a PLA Will a PLA impact the cost of submitting an offer Are there any concerns regarding labor-management stability related to this project Will the use of a PLA produce labor-management stability on this project Have labor disputes or other labor issues contributed to project delays in the local area Are you aware of examples of labor-management conflicts in the area which could impact the efficiency of this project, which a PLA could positively impact/resolve What market share does union labor in construction trades have in the geographic area Which existing Collective Bargaining Agreements will expire during construction of this project Will use of a PLA be conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters on this project Are there instances where these standards have not been met on Federal contracts in the local area Were PLAs used for those specific contracts This project will require construction contractors and/or subcontractors employing workers in multiple crafts or trades; do you foresee any work on this project that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade Are there any concerns by prime contractors on the availability of skilled construction labor Are there large scale construction projects in the area (over $25M, within 50 miles) which could impact availability of skilled labor for this project What is the anticipated volatility in the labor market for the trades required for the execution of the project Are existing apprentice programs providing sufficient numbers of skilled workers for future requirements Is the proposed schedule/completion time one which would benefit from a PLA - if so, how Will a PLA impact the completion time Would a PLA benefit a project which contains a unique and compelling mission-critical schedule Are you aware of comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of this project For each project, please indicate if a PLA was used, the initial and final cost, number of trades on the project, if the project was completed on time, and if there were any challenges such as labor shortages, labor related delays, safety issues, etc... Will the use of PLAs impact the ability of potential offerors and subcontractors to meet small-business utilization goals Will inclusion of PLA requirements affect your decision to submit a proposal for this project If so, please detail how it will affect your decision. Respondents to this Sources Sought are advised that any/all documents related to the use of a project labor agreement for the subject contract become records of the Government and the Freedom of Information Act (FOIA) requirements may apply to the release of PLA market research results. Responses are limited to twenty pages. Responses are due by November 20, 2024. Responses should be emailed to: Tyler Maryak: tyler.s.maryak@usace.army.mil Phone Contact: (978) 318-8049 Interested firms shall provide the above documentation in one original form and one copy. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Power Plant
$250,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
To Be Determined, Bourne, MA
Related To This Project
Bourne, MA
Bid Date: Oct 24 2024
Bourne, MA
Bid Date: Oct 04 2024
Bourne, MA
Bid Date: Oct 04 2024
Bourne, MA
Bid Date: Sep 19 2024
Bourne, MA
Bid Date: Aug 29 2024
Bourne, MA
Bid Date: Aug 20 2024
Bourne, MA
Bid Date: Aug 14 2024
Bourne, MA
Bid Date: Aug 12 2024
Bourne, MA
Bid Date: Aug 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.