BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2025 at 7:00 PM

Updated January 22, 2025

Site work, paving and outdoor lighting for a mixed-use development in Chicago, Illinois. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Rehab of Parking Lot B - SBI1 Deadline for Questions: 04:00 PM Central Time, 17-OCT-2024 General Description of the Work: The Work consists of furnishing all means, methods, labor, materials, tools, equipment, transportation and services for performing the Civil Work as shown on the Drawings and as described in the Technical Specifications, including all appurtenant work and accessories, to the complete satisfaction of, approval and acceptance by the City. This includes, but is not limited to the following: The project scope involves the removal of existing pavement (mill) to the existing base course and replacement (fill) with bituminous material. Services also include replacement of existing parking lot lighting with Light Emitting Diode (LED) lighting and all signage and marking required for the parking lots. This description of work is intended to be general in nature and is neither a complete description nor a limitation on the Work to be performed. Contractor must perform all Work described in the Contract Documents or reasonably inferable as necessary to produce the results specified therein, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. Estimated Project Cost: $3,000,000 - $5,000,000

Post-Bid

Water / Sewer

$5,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

53

19

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
264
Bidding Soon
3,542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

March 17, 2025

Project location map

10000 W Balmoral Ave, Chicago, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.