BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2024 at 7:00 PM

Updated November 7, 2024

Renovation of an educational facility in Philadelphia, Pennsylvania. Completed plans call for the renovation of a educational facility.

The Kentucky Community and Technical College System, Office for Facilities Support Services, on behalf of Jefferson Community & Technical College (JCTC) desires to procure professional services (Architect) and an associated project team to accomplish the Replacement of Hartford Tower, Phase II on their main campus in downtown Louisville, Kentucky. This project will provide for Phase II of the replacement of the Hartford Building at Jefferson CTC Downtown Campus. Phase I was the construction of a new Science Building which is currently under construction across the street from the Hartford Building. Based on a feasibility study, it was determined to be more efficient to construct two new facilities to replace the current outdated building. The second phase will demolish the Hartford Building, reconcile the existing utility infrastructure that runs under the tower that serves the main campus and to construct the second replacement building on the tower site to house mathematics classrooms, large lecture rooms, and student services that are being displaced by the demolition of the Hartford Building. There will also be an elevated pedestrian way across South First Street to connect to the Science Building currently under construction on the opposite side of the street. Funding available for this project is currently limited to funding for design of the project through Phase C - Construction Documents. However, it is expected and anticipated that funding will be available immediately following the Design Phases so that construction is planned to begin in sequence without significant pause following design. It is anticipated that the project could be accomplished through several early bidding packages that would demolish the existing tower, reconcile the existing infrastructure and then construct the new classroom building. The splitting of the project into these early bidding packages will be discussed and determined during Phase A design development of the project. All Questions are due to the POC Brandon Carlson, KCTCS Capital Contracting Officer, no later than (NLT) 4:00 pm EST 29 October 2024.

Post-Bid

Educational

$35,700,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
855
Active Projects
459
Bidding Soon
6,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

January 6, 2025

Project location map

To Be Determined, Philadelphia, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.