BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Ephraim, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Ephraim City is seeking qualified contractors to submit bids for the repair and resurfacing of a .3-mile section of trail connecting Mill Road to Canyon Road. The trail is used by both bikers and ATV enthusiasts. It is 4 yards wide and will require the application of road base (approximately 2-4 inches) to smooth out uneven surfaces and eliminate bumpiness. Water bars will need to be installed along the trail to prevent erosion and water damage during heavy rains. The project budget is $12,000.00. Roads and landscape material including asphalts and road and railroad construction materials and soil stabilizers and artificial turf and construction aggregates including rock, gravel, and sand Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation Paving service including highway paving and road paving and infrastructure building services and parking lot and surfacing services Questions: Deadline for Submitting Questions: October 30, 2024, by 5:00 PM MST. All questions should be directed to Jordan Howe at the provided contact information. Questions concerning the scope and specifications of services should be directed to: Jordan Howe - Recreation Director - Jordan.howe@ephraimcity.org and Verena Critser verena.critser@ephraimcity.org. Ephraim City reserves the right to accept or reject any or all bids and is not obligated to select the lowest bid. The city encourages all interested and qualified contractors to submit proposals for consideration. Scope of Work: 1. Trail Repair: Surface leveling and smoothing of .3 miles of the trail (4 yards wide). Application of 2-4 inches of road base to the full length and width of the trail. Installation of water bars to mitigate erosion and protect the integrity of the trail during storms. 2. Materials: Road base to be sourced and provided by the contractor. 3. Site Preparation: Any additional preparation required before applying the road base.

Post-Bid

Roads / Highways

$12,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
6
Bidding Soon
167
All Active Projects
85
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

November 22, 2024

img_map_placeholder

Multiple Locations, Ephraim, UT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.