BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Steele, Missouri. Completed plans call for site work for a water / sewer project.

The Project generally includes three contracts involving the following: Contract 1- water distribution system replacement with approximately 52,384 feet of 4-inch through 8-inch waterlines, fire/flush hydrants, gate valves, and tie-ins to existing system Contract 2 -- Treatment plant and Well #2 rehabilitation including the well discharge piping, chlorine room, filter valves, filter piping, head tank coating, controls, metering, chemical feed equipment, electrical, and all accessories. Properly abandon Well No. 1 in accordance with DNR requirements. Contract 3 -- 250,000 gallon elevated and two ground storage tank rehabilitation and painting. Bids shall be a combination of lump sum and unit prices. Three contracts will be awarded for all work. Bidding Documents via delivery service. The shipping charge amount will depend on the shipping method selected by the prospective Bidder. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bidders should note the requirements for OSHA training of workmen and the requirements prohibiting the employment of unauthorized aliens prohibited including the submission of an Affidavit of Work Authorization with their bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Nondiscrimination in Employment: Bidders on this work will be required to comply with the President's Executive Order Number 11246. Requirements for bidders and contractors under this order are explained in the specifications. Bid security shall be furnished in accordance with the Instructions to Bidders. Owner: City of Steele, Missouri ENGINEER'S ESTIMATE: CONTRACT 1 - $3,000,000 CONTRACT 2 - $600,000 CONTRACT 3 - $400,000 Question Deadline 10/25/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered Apparent Low Bids: Contract 1 - Josh Tinnin Construction, LLC Contract 3 - C A Walker Construction Contract 3 - Maguire Water Inc.

Bid Results

Water / Sewer

$4,000,000.00

Public - City

Site Work

32

12

14

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
24
Bidding Soon
417
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.