BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a clubhouse / community center in Monterey Park, California. Completed plans call for the renovation of a clubhouse / community center.

Site Directions: Barnes Gymnasium located at 350 McPherrin Avenue, Monterey Park CA 91754. For questions, contact via e-mail only: ANTHONY BENDEZU - ABENDEZU@MONTEREYPARK.CA.GOV Question Deadline 10/24/2024 Project consists of the replacement of the existing flooring at Barnes Gymnasium and all related work on file. Contract Time: 40 Working Days; Liquidated Damages: $1000 Per Working Day; A 10% Bidder's Bond is Required With Bid. Successful Contractor Will Be Required to Provide: (1) Liability Insurance With City of Monterey Park as Addition Insured Endorsement; (2) Proof of Workers' Compensation Insurance Coverage; (3) 100% Faithful Performance; and, (4) 100% Labor and Material Bond, (5) Dir Registration. A. The contractor shall remove the existing court and replace with a new indoor basketball court maple strip wood floor at the Barnes Gymnasium located at 350 S. MacPherrin Avenue, Monterey Park CA 91754. B. The contractor shall provide all labor, materials, tools and equipment to complete the removal of old floor and installation of new floor, including subflooring system (approximately 7,454 square feet) C. The scope of work shall include, but not limited to, the following: a.Removal and disposal of existing maple strip wood floor. b.Removal and disposal of existing plywood subflooring system. c.Install one (1) vapor barrier d.Rack out and install one (1) maple wood floor system e.Apply striping for one (1) main basketball court, two (2) side basketball courts, and three (3) pickleball courts. Colors to be approved by the City. f. Apply one center logo (City of Monterey Park logo). g.Install new wall cove base. h.Remove any and all waste. i. All work to be performed in one phase during regular working hours. D. Basis of design shall be the "Alliance" sports floor system as provided by Connor Sports (or approved equal). E. Complete installation shall be carried out by an experience installer (C-15 Flooring Contractor). All work shall be performed in accordance with most recent installation instruction of the manufacturer. F. The installed flooring system shall be independently evaluated to meet established performance standard for the athletic flooring industry (Maple Flooring Manufacturers Association PUR, ASTM F2772).

Bid Results

Clubhouse / Community Centers

$143,500.00

Public - City

Renovation

3

8

10

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,262
All Active Projects
1,011
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 2, 2024

img_map_placeholder

350 S Mc Pherrin Ave, Monterey Park, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.