Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Huntington Beach, California. Completed plans call for the renovation of a playground / park / athletic field.
You are invited to review and respond to an Invitation for Bid (IFB) entitled Bolsa Chica State Beach Employee Lockers Renovation, located at Bolsa Chica State Beach, 17851 Pacific Coast Hwy, Huntington Beach, CA 92649, Orange Coast District, CA State Parks. The Solicitation Number is C24925013. In submitting your bid you must comply with these instructions. The DVBE Participation Requirement for this solicitation has been waived. Contractor hereby agrees to furnish all materials, tools, equipment, and labor necessary to demolish and replace employee lockers. Complete specifications in Exhibit A, Attachment 1. Bidder must attend to be eligible to bid. You must sign in no later than 10:00 AM with the State Representative. It is not the State's responsibility to ensure all attendees are signed in. Late attendees will be disqualified. Questions may be submitted in writing, via email to Ryan.Thorne@parks.ca.gov until 2:00 PM PST on October 15th. Project Location: Bolsa Chica State Beach, 17851 Pacific Coast Hwy, Huntington Beach, CA 92649 Contractor hereby agrees to furnish all materials, tools, equipment, and labor necessary to construct locker room lockers adhered to the wall. The lockers shall be connected to four walls in specificized locations. Because of the nature of this project all square footages, dimensions and locations of areas are approximate; therefore, a Pre-bid walk-through of all bidding contractors is mandatory. Description of work to be done: Demolition and Removal: o Contractor shall demolish and remove current lockers located in the designated area. Ensure that all lockers are carefully dismantled to avoid damage to surrounding structures. After dismantling, promptly haul away all debris and scrap materials, and ensure the site is left clean and clear of any remnants. All new lockers: o Shall be made of 3/4" Marine Grade Laminated Plywood. The locker doors shall be made of 1/2" Marine Grade Plywood. All plywood shall be Laminated with a color as instructed by the Department of Parks and Recreation representative. o Shall be installed with stainless steel door clasps, stainless steel hinges, stainless steel vents, with chrome hanger rob and clip. Wall #1: Shall be 12 (twelve) lockers, approximately 139"(L) x 96"(H) x 26"(D). Locker height shall be from the existing concrete base. The lockers shall be double hung style, sparate top and bottom hung lockers. Each locker shall be approximately 23" in individual width. All individual lockers shall have a 7" high open shelf of the maximum depth and width of the internal dimension. The shelf shall be located on the lower most portion of the top bank of lockers and upper most portion of the bottom bank of lockers. Wall #2: Shall be 6 (six) lockers, approximately 78"(L) x 96"(H) x 26"(D). Locker height shall be from the existing concrete base. The lockers shall be double hung style, sparate top and bottom hung lockers. Each locker shall be approximately 25.25" in individual width. All individual lockers shall have a 7" high open shelf of the maximum depth and width of the internal dimension. The shelf shall be located on the lower most portion of the top bank of lockers and upper most portion of the bottom bank of lockers. Wall #3: Shall be 12 (twelve) approximately 60"(L) x 96"(H) x 26"(D). The lockers shall be triple hung style, sperate top, middle, and bottom hung lockers. Each locker shall be approximately 15" in individual width. The lockers shall be placed on a 5.5" high kick-plate base to match the height of tile base on wall 1, 2 and 4. Wall #4: Shall be 16 (sixteen) Lockers, approximately 129"(L) x 90"(H) x 26"(D). ). Locker height shall be from the existing concrete base. The lockers consist of 4 (four) double hung style, sperate top and bottom hung lockers, approximately 24" in individual width. All 4 (four) individual lockers shall have a 7" high open shelf of the maximum depth and width of the internal dimension. The shelf shall be located on the lower most portion of the top bank of lockers and upper most portion of the bottom bank of lockers. As well as 12 (twelve) lockers, triple hung style, sperate top, middle, and bottom hung lockers. Each locker shall be approximately 20" in individual width DVBE (3%), SBE (5%) Estimated Cost of Project: $35,000.00
GC Bidding
Playgrounds / Parks / Athletic Fields
$35,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 22, 2024
December 23, 2024
17851 Pacific Coast Hwy, Huntington Beach, CA
Related To This Project
Huntington Beach, CA
--
Huntington Beach, CA
Bid Date: Nov 08 2024
Huntington Beach, CA
Bid Date: Dec 10 2024
Huntington Beach, CA
Bid Date: Oct 21 2024
Huntington Beach, CA
Bid Date: Oct 02 2024
Huntington Beach, CA
--
Huntington Beach, CA
Bid Date: Sep 26 2024
Huntington Beach, CA
Bid Date: Sep 17 2024
Huntington Beach, CA
Bid Date: Sep 05 2024
Huntington Beach, CA
Bid Date: Aug 08 2024
Huntington Beach, CA
Bid Date: Aug 22 2024
Huntington Beach, CA
--
Huntington Beach, CA
Bid Date: Jul 18 2024
Huntington Beach, CA
Bid Date: Aug 01 2024
Huntington Beach, CA
Bid Date: Aug 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.