BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Clemson, South Carolina. Conceptual plans call for site work for a water / sewer project.

This is a Sources Sought Request for Information only. This is not a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. The U.S. Army Corps of Engineers, Savannah District is issuing the sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support the requirement for civil works construction. The result of this market research will contribute to determining the method of procurement. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 541330 with a size standard of $25.5 Million. The potential magnitude for this requirement is estimated between$100,000. and $250,000. in accordance with FAR 36.204 (f). Inquiries will only be accepted via email to Contract Specialist, Sarai Hayward at Sarai.Hayward@usace.army.mil please CC the Contracting Officer, Nathan Aylesworth at nathan.a.aylesworth@usace.army.mil requested information should be completed and submitted no later than the response date and time listed in this announcement. Background The Clemson Diversion Dams are high hazard potential embankment dams located on Hartwell Lake in the town of Clemson, South Carolina. The dams are part of the Hartwell Dam and Lake Project. They were constructed to prevent Hartwell Lake from inundating portions of Clemson University, a public land-grant research university currently enrolling approximately 26,000 students each year. The components of the project are three embankments and a pump station, which removes interior drainage from the university by pumping it into Hartwell Lake. The three embankment dams are named the Clemson Upper Diversion Dam, Clemson Lower Diversion Dam, and the Clemson Lower Diversion Dam Saddle Dike. The Clemson Dam Discharge Pipe Project is along the Lower Diversion Dam along the western edge of the dike (see attachment Table 2). Borings will be obtained over water, so it will require a drill rig mounted on a spud barge or other floating platform. Daily transport to and from the drilling platform will be by boat. Assignment This scope of work (SOW) consists of SPT/core borings within Lake Hartwell along the western side of the Lower Diversion Dam as shown in attachment Table 3. This investigation requires drilling equipment and platforms that can perform drilling in water with depths up to 40-ft. The drilling program consists of 8 over water borings. Borings will be acquired by Standard Penetration Test (SPT) and HQ rock coring boring methods at locations shown on attachment Table 1. Borings 5, 7, 11 and 12 will require 10' of HQ diameter rock coring. The remaining borings will be terminated at the top of competent rock. The SPT method will be used to sample subsurface soils using a 1-3/8 inch ID split-spoon sampler. The predominant soil types expected to be encountered are residual (ML, SM) type soils and weathered rock. Split-spoon sampling taken at 5-ft intervals to a depth of 20 feet. After 20 feet, augers will be advanced into competent rock. A removable center pilot bit (stinger) can then be inserted into the cutting shoe to prevent soil infiltration into the augers during advancement to each subsequent sampling interval. The hollow stem auger will serve as the drilling casing to contain the water necessary for rock coring activities. A wire-line rock core bit will then be used to core 10 feet into competent bedrock. Water pressure will be monitored via a floating needle pressure valve throughout the coring process. The center pilot bit shall be removed, and bentonite pellets will then be tremied down-hole and saturated to form a seal at the bottom of the augers. Standard penetration tests and sampling will be performed in accordance with ASTM D1586 (Standard Test Method for Penetration Test and Split-Barrel Sampling of Soils). The soil samples will be placed in quart jars for subsequent lab testing. Sample jars will be equipped with moisture tight screw caps. All material retrieved in the borings shall be stored in core boxes and labeled. Unconsolidated material shall be put in plastic jars. Each split- spoon sampler will be labeled and photographed per the Section C of the base contract for inclusion in the final data report. Selected rock samples will be wrapped in preparation for geotechnical analyses. Contractor must provide daily transportation for Government Geologist to/from drill rig from dry land. Rights of Entry Government will arrange for site access and obtain keys to all gates prior to site mobilization. Schedule Work is estimated to begin in November 2024 and be completed by December 2024. If you are interested in this project and/or your organization has the potential capacity to perform these services, please submit the following to the Point of Contacts (POC) information listed below: Name and Address of your Firm Point of Contact (name/phone/email) Company website Unique Entity Identifier (UEI) number Commercial and Government Entity (CAGE) code Business Size, to include designation as HUBZone, 8(a), Service-Disabled Veteran Owned Small Business, Small Disadvantaged Business, Woman-Owned Business, and Large Business. The Government must be able to verify SBA certification of HUBZone, 8(a), and SOB via the System for Award Management (SAM) (http://www.sam.gov/). This is a Draft Statement of Work. Please advise if you are able to start work by 15 NOV 2024. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$250,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
44
Bidding Soon
811
All Active Projects
390
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2025

img_map_placeholder

To Be Determined, Clemson, SC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.