BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Kingdom City, Missouri. Completed plans call for site work for a water / sewer project.

This project consists of providing the labor, equipment, and materials, to construct approximately 500 feet of new 8-inch natural gas pipeline approximately eight (8) to twelve (12) feet offset from an existing in-service high-pressure natural gas pipeline by boring under Interstate 70 inCallaway County, Missouri near mile marker 124. The new pipeline will need to be connected to the existing pipeline on both sides of the Interstate without a disruption in service. Should any bidder find any discrepancies in the specifications or be in doubt as to their meaning, he shall request clarifications, and written explanation will be sent to all concerned. Point of contact is: Ted Christensen, Platte Landing Utility Services, LLC ((816) 500-8886 for technical questions or Kyle Bruemmer, P.E., City Engineer (573) 592-3111 for contract questions. The DBE Contract Goal for this project is 0 %. There is no On the Job Trainee goal. The City of Fulton anticipates issuing notice to proceed in the fall of 2024 with desired completion in 2024. Each bidder must deposit with his bid, security in the amount of (5%) of the bid amount, in accordance with the Instructions for Bidders. LIQUIDATED DAMAGES: The bidder agrees that, should the bidder fail to complete the work in the time specified or such additional time as may be allowed by the engineer under the contract, the amount of liquidated damages to be recovered shall be as follows: Liquidated damages per day $ 2,000.00

GC Bidding

Water / Sewer

$200,000.00

Public - City

Site Work

13

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
25
Bidding Soon
461
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2024

November 20, 2024

img_map_placeholder

I-70, Kingdom City, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.