BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sumner, Washington. Completed plans call for site work for a water / sewer project.

All bid proposals shall be accompanied by a proposal guarantee (certified or cashier's check or approved bond) payable to the City of Sumner in an amount not less than five percent (5%) of the amount of the proposal price. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Sumner. The City of Sumner in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, Non discrimination in Federally Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. The City of Sumner is an Affirmative Action/Equal Opportunity Employer and hereby notifies all Bidders that it will affirmatively ensure that in any Contract entered into pursuant to this advertisement disadvantaged business enterprises will be given the full opportunity to submit Bids in response to this invitation. The City of Sumner does not discriminate on the basis of race, color, national origin, sex, religion, age, or disability in employment or the provisions of services. The Successful Bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. The contractor will have 110 working days to complete the work in compliance with all applicable laws and regulations. The project will be awarded to the contractor based upon the total amount of the Base Bid and Schedule A bid. The Engineer's estimated range for the Base Bid for this project is between $1,200,000 and $1,500,000. For technical questions, please call Andrew Leach, Associate City Engineer, at 253-299-5711 or andrewl@sumnerwa.gov. The City of Sumner reserves the right to waive informalities in the bidding, accept a Proposal of the lowest responsible Bidder, reject any or all Bids, republish the Call for Bids, revise or cancel the work, or require the work to be done in another way if the best interest of the City is served. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The improvements for which bids will be received are described as follows: Base Bid - The Base Bid includes improvements to the City's existing South Tank Reservoir (STR) including full containment of the reservoir; seal welding of lapped roof plates, seal welding rafters to the reservoir roof, replacing reservoir vent, adding lateral bracing to overflow pipe, adding funnel to overflow pipe, adding flexible expansion joints to reservoir inlet, outlet, and drain, and adding a seismically controlled butterfly valve and actuator assembly on the reservoir outlet. Schedule A - The Schedule A Bid consists of surface preparation and coating repair of the reservoir interior and exterior where damaged from the construction activities of the Base Bid improvements. This schedule shall also include coating of any new metals added as part of the Base Bid improvements. The Schedule A bid will only be executed if Schedule B work is not executed. Schedule B - The Schedule B Bid consists of sand blasting and recoating of the entire reservoir interior and exterior. Full recoating of the reservoir interior and exterior will be executed if selected by the City, based upon Contractor's Bid Price. The South Tank Reservoir is a 2.0 Million Gallon (MG) welded steel AWWA D100 reservoir 104 feet in diameter and 32 feet in height.

Bid Results

Water / Sewer

$1,239,000.00

Public - City

Site Work

22

15

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
27
Bidding Soon
669
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.