BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2024 at 7:00 PM

Updated December 2, 2024

Site work and paving for a civil project in Buffalo Township, Missouri. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

Construction of Roadway Improvements to Pike County 251 from Route NN to approximately 275 feet east of CR 252 in Pike County. Improvements include grading, earthworks, aggregate base, paving, replacement of box culverts, restoration, and any incidental work in accordance with the plans and specifications. Total length of the improvements is approximately 1.0 mile All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. A certified cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The Pike County Commission reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. The DBE Goal for this project is 3.1%. No 2nd tier subcontracting will be allowed on this project. MODOT - Pike County 251 Improvements MBE (3.1%), WBE (6.9%), DBE (3%) Question Deadline 10/25/2024 No interpretation of the meaning to the plans, specifications, or other pre-bid documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to Shannon Shank, PE at Great River Engineering, 2826 S. Ingram Mill, Springfield, MO 65804

Bid Results

Roads / Highways

$1,217,320.00

Public - County

Paving, Site Work

35

5

8

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
80
Bidding Soon
1,213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 2, 2024

Project location map

Pike 251, Buffalo Township, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.