EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 8, 2025 at 7:00 PM

Updated October 1, 2024

Site work, paving, new construction and renovation of a civil project in Bethel, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a water / sewer project; and water / sewer project.

The project includes construction of upgraded and new wastewater treatment facilities for the Village of Mt. Orab, Ohio. Major facilities include the upgrade and expansion of the existing wastewater treatment plant (WWTP) to a design average-day flow of 1.20 million gallons per day (MGD), maximum-month treatment capacity of 1.81 MGD and a peak flow of 2.75 MGD. The improvements at the WWTP include the following: Pre-treatment Building flow splitter box modifications; Equalization (EQ) Basin modifications and conversion to a Conventional Activated Sludge (CAS) secondary treatment basin including new blowers, aeration piping and fine-bubble diffusers; replacement of an oxidation ditch aerator; weir gate modifications within the oxidation ditches; modifications to the clarifier splitter chamber; a new 54-foot-diameter clarifier; modifications to the return activated sludge (RAS) pump stations; a new RAS splitter chamber; replacement of existing disinfection facilities with new expanded ultra-violet (UV) disinfection facilities; modified post-aeration facilities; effluent flow meter and vault; yard piping improvements; site grading including retaining wall, fencing and paving; two new emergency generators; electrical improvements; and instrumentation/process control equipment. The improvements also include a new concrete channel structure at the existing Main Pump Station (located separately from the WWTP) and re-installation of an Owner furnished mechanical bar screen. Each Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of ten percent of the Bid. Bidders may not withdraw their Bids for a period of 120 days, excluding Saturdays, Sundays, and legal holidays after the actual date of the opening of the Bids. The Successful Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. Complete instructions for filing Bids are included in the Instructions to Bidders. Wage rates for this Project are subject to minimum Federal Wage Rates. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest. All questions about the meaning or intent of the Contract Documents shall be received in writing by CDM Smith, 11500 Northlake Drive, Suite 305, Cincinnati, OH 45249, Attn: Andrew Bohlen, at least ten days before the date set herein for the opening of bids. 1. Re-installation of an existing mechanical screen at the existing Main Pump Station, remote from the Wastewater Treatment Plant site. 2. Pre-treatment Building flow splitter box modifications. 3. Equalization (EQ) Basin modifications and conversion to a Conventional Activated Sludge (CAS) secondary treatment basin. 4. New blowers, aeration piping and fine-bubble diffusers. 5. Replacement of an oxidation ditch aerator. 6. Modifications to an existing clarifier splitter chamber. 7. A new 54-foot-diameter clarifier. 8. Modifications to a return activated sludge (RAS) pump station. 9. A new RAS splitter chamber. 10. Replacement of existing disinfection facilities with new expanded ultra-violet (UV) disinfection facilities. 11. Modified post-aeration facilities, effluent flow meter and vault. 12. Yard piping improvements. 13. Site grading including retaining wall, fencing and paving. 14. Two new emergency generators. 15. Electrical improvements. 16. Instrumentation / process and control equipment. 17. Other Work indicated in the Contract Documents.

Bid Results

Water / Sewer

$6,065,000.00

Public - County

New Construction, Paving, Renovation, Site Work

82

27

6

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
74
Bidding Soon
1,214
All Active Projects
502
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2024

December 24, 2024

img_map_placeholder

12943 US-68, Bethel, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.