BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Site work and paving for a road / highway in Fredericktown, Missouri. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of September 29, 2025, design team identified. Location: At Routes A and C Proposed Improvement: Widening and intersection improvements to install J-Turns and/or other safety improvements at Routes A and C. Length: 1.35 miles Approximate Construction Cost: $1,850,000 DBE Goal (if applicable) 5% Consultant Services Required: Surveying: MoDOT to provide all necessary survey data. Roadway Design: Consultant to prepare all conceptual, preliminary, right of way, final roadway design and plan preparation as necessary to submit final roadway plans, specifications and estimates. (PS&E). Conduct one to two public meetings to present preliminary plan (provide displays, handouts) Utilities: Coordination of utilities that may be required to be relocated. Work with MoDOT District Utility Staff in determining best course of action for relocating utilities. Geotechnical: Consultant to perform all geotechnical work and will provide Preliminary Geotechnical Report. Environmental: RES submittals at milestones (conceptual, preliminary, right of way, and final), and informational support as requested. Other Comments: Interviews or presentation will not be required for the consultant selection. Tentative Date of Consultant Selection – December 27, 2024 The Missouri Highways and Transportation Commission is requesting the services of a consulting engineering firm to perform the described professional services for the project included on the attached list. MoDOT will evaluate firms based on: Project Understanding & Innovation, Past Performance, Qualifications of Personnel Assigned, General Experience of Firm, Familiarity/Capability, Accessibility of Firm & Staff. Firm’s not providing a response on approach to workforce diversity will be considered nonresponsive to this solicitation. Firm’s that are not current on all of the required prequalification categories found in MoDOT’s Approved Consultant Prequalification List at the date of the solicitation expiration will be considered non-responsive. The method of Contractor Selection has not been Determined at this time. MODOT - Widening and Intersection Improvements to Install J-Turns and/or Other Safety Improvements at Routes A and C

Design

Roads / Highways

$1,850,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
60
Bidding Soon
896
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

Project location map

US-67, Fredericktown, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.