BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in San Antonio, Texas. Completed plans call for the renovation of a detention facility.

Bexar County Krier Center Improvements Bidders should use Lump Sum Pricing. County payment methods are check or ACH. Bid bond is required. This project is expected to be completed approximately 270 business days from the date of the Notice to Proceed, unless noted otherwise by bidder on bid form for construction duration. Due to shipping delays, Contractor has the option to recommend completion date based on anticipated delivery schedule and may be noted on Bid Form Bexar County Facilities Management (BCFM) is soliciting competitive bids from contractors for the buildout of approximately 1,200 square feet of additional space and the remodeling of existing areas. This project aims to create a multi-use flex space featuring a movable partition, as well as additional storage, a toilet room, and a mechanical room. Build out approximately 1200 square feet (sf) of additional space and remodel existing space to provide a multi-use flex space with a movable partition, additional storage, toilet room, and mechanical room For needed mechanical, plumbing, and electrical systems work at both builds A and B, including replacing corroded areas of existing hydronic piping that is located in Building G but serves Buildings A & B. Additionally, the project includes five alternates: Building B Offices, Medical Area, Classrooms, Nurse Stations in Medical Area, and French Drain. The following event questions must be answered and submitted as part of your submission in the following ways: 1) Physically delivered if delivering a hard copy submission, or 2) Electronic submission via the Supplier Portal, Question tab. Definition: A request seeking one of the following: 1. An interpretation, amplification, or clarification of some requirement of Contract Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents. 2. A resolution to an issue which has arisen due to field conditions and affects design intent.

Post-Bid

Jails / Prisons

$1,000,000.00

Public - County

Renovation

75

24

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
37
Bidding Soon
1,810
All Active Projects
640
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

December 9, 2024

img_map_placeholder

3621 Farm Rd, San Antonio, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.