Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 17, 2024 at 8:00 PM
Updated October 18, 2024
This is a service / maintenance or supply contract in Bishops Falls, Newfoundland. Contact the soliciting agency for additional information.
Closing time: 2:00PM Question Acceptance Deadline 2024/10/09 12:00:00 AM NDT Provide a New Individual Legal Survey for Each Address at 2-18 Junction Rd., Bishops Falls, Nl as Noted Within Schedule F - Legal Survey. Survey is to Be Prepared by a Company Registered With the Association of Newfoundland Land Surveyors. 2.2 Provide Details Such as the Location and Outline of Buildings, Fences (if Any), Driveways, and Other Structures. 1 Perform all work within existing safety requirements of jurisdictional authorities, Occupational Health and Safety Act and Regulations, Workplace Health, Safety and Compensation Regulations, National Building Code - Section 8 "Safety Measures at Construction and Demolition Sites and all other relevant acts, ordinances, by-laws, regulations and codes. Protect adjoining buildings and sites from damage caused by this work and make good, at no cost to Owner, any such damages. 3 Protect the property of tenants and interior finishes by using drop sheets, tarpaulins, etc. 4 Pump dry excavations, pits and other construction holes or depressions. 5 Remove snow and ice immediately from all parts of the building except from finished roof. 6 Immediately repair, resod and replant any damaged lawns, planting. landscaping area or building surfaces or structures. Do not store materials in building in a manner to overload the structure beyond its design capacity. 8 Keep surfaces to be finished free of dirt, grease, oil and other deleterious materials which may impair the subsequent application of finishes. 9 Schedule finish work at end of construction when interference from tradesmen is at a minimum, Do not allow heavy or rough items to rest against finished surfaces. Protect each finished surface of completed work by methods approved by its applicator. 12 Protect roof membranes from damage following their installation and during remainder of project work. 13 Enforce fire prevention methods at site: 1 Do not permit bonfires, open flame heating devices or accumulation of debris. 2 Store and use inflammable materials in accordance with applicable safety standards. 3 Do not store flammable materials in the building. 4 Take necessary precautions to prevent spontaneous combustion. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Conceptual
Multi-Residential
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
