Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Wake Forest, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Street Resurfacing Project The Town of Wake Forest reserves the right to reject any or all bids and to make the award as deemed in the best interest of the Town of Wake Forest. Trackless tack shall be used as the tack coat material. In the event that trackless tack is unavailable, standard tack coat material that meets NCDOT Standard Specifications shall be used. Standard tack material shall be incidental to the asphalt surface course. Asphalt tack coat shall be in accordance with the latest version of NCDOT Standard Specifications for Roads and Structures section 605. There will be no direct payment for work covered by this section. Payment at the contract unit prices for the various mix items covered by section 610, 650 and 654 will be full compensation for all work covered by this section. Perform the work covered by this section including, but not limited to, the construction of one or more courses of asphalt mixture placed on a prepared surface in accordance with these Specifications and in reasonably close conformity with the lines, grades, thickness and typical sections shown on the plans. This work includes producing, weighing, transporting, placing and compacting the plant mix; furnishing aggregate, asphalt binder, anti-strip additive and all other materials for the plant mix; furnishing scales; maintaining the course until final acceptance of the project; making any repairs or corrections to the course that may become necessary; providing and conducting QC as specified in Section 609 of the NCDOT; and surface testing of the completed pavement. Perform all activities in accordance with the NCDOT Asphalt Quality Management System (QMS) Manual in effect on the date of contract advertisement. Asphalt Concrete Surface Course Type S9.5B or S9.5C, as directed by the Engineer, shall be used. It shall be in accordance with Section 610 of the NCDOT Standard Specifications for Roads and Structures. The work covered in this section consists of the adjustment of manholes, water valve boxes, and other utilities in the roadway. The Contractor shall complete the work in strict accordance with Town of Wake Forest Standards and Specifications, City of Raleigh Standards and Specifications, NCDOT Standard Specifications for Roads and Structures, and ACI Specifications. The Contractor shall complete the work in this section in strict accordance with Town of Wake Forest Standard Details Curb Ramps and ACI Specifications. The project consists of constructing or reconstructing identified intersections with sidewalk access ramps. The location of each facility may vary due to existing catch basins, fire hydrants, poles, or other constraints. Prior to beginning any construction, each work site shall be examined by the Contractor and the Director of Engineering, at which time the Director of Engineering will give specific direction as to the concrete removal limits and location of the new facility. Perform the work covered by this section including, but not limited to, milling and re-milling the pavement at locations, depths, widths and typical sections indicated in the contract; cleaning the milled surface; loading, hauling and stockpiling the milled material for use in recycled asphalt mixtures; and disposal of any excess milled material in areas provided by the Contractor in accordance with Town Ordinances pertaining to disposal of construction waste.
Post-Bid
Roads / Highways
$200,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2024
November 25, 2024
Multiple Locations, Wake Forest, NC
Related To This Project
Wake Forest, NC
Bid Date: Oct 10 2024
Wake Forest, NC
--
Wake Forest, NC
--
Wake Forest, NC
--
Wake Forest, NC
Bid Date: Dec 02 2024
Wake Forest, NC
Bid Date: Dec 10 2024
Wake Forest, NC
--
Wake Forest, NC
Bid Date: Oct 23 2024
Wake Forest, NC
--
Wake Forest, NC
--
Wake Forest, NC
--
Wake Forest, NC
Bid Date: Sep 23 2024
Wake Forest, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.