Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Brookport, Illinois. Conceptual plans call for site work for a water / sewer project.
Market Survey/Sources Sought - Smithland Lock and Dam Lock Control Update and Repair A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Business and you are interested in this project please respond appropriately. Project Location: 1401 Smithland Dam Rd, Brookport, IL 62910 Project Description: Design/Bid/Build - Refresh of lock control system. Main efforts include the following scope items: a. Replacement of all existing lock machinery position instrumentation (magnetic proximity switches, rotational encoders) and their associated wiring. b. Replacement of segments of existing control cabling between control shelters and powerhouse. c. Replacement of existing lock control interface panels with updated interface panels d. Reconnection of control relaying associated with lock miter gate speed control. e. Modification of lock controls to incorporate modern interlock requirements. Contract duration is estimated at 540 calendar days. The estimated cost range is between (FAR 36.204 & DFARS 236.204). NAICS code is 237990. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Business contractors should respond to this survey via email by Monday, November 11, 2024 by 4:00 PM Eastern Time (Extended from Tuesday, October 22, 2024 by 4:00 PM Eastern Time.) Responses should include: Identification and verification of the company's small business status. Contractor's Unique Entity Identifier (UEI). Documentation from the firm's bonding company showing current single and aggregate performance and payment bond limits. Description of Experience - Provide descriptions your firm's past experience on up to three (3) projects with greater than 95% construction complete, or those projects completed within the last five years which are similar to this project in size, and scope. Provide documentation demonstrating experience for construction of similar type buildings and managing multiple sub-contractors. Demonstrate experience including self-performing 15% of the construction. Provide documentation demonstrating experience for projects of similar type projects. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. Projects similar in Scope to this project include: Industrial controls work which include lock control instrumentation, control relay work, cable routing, panel fabrication, and mounting bracket fabrication. Projects consisting of replacement of the dam tainter gate remote height indication equipment, and rehabilitation or replacement of power distribution equipment both inside and outside of the main motor control system will also be considered similar in scope. Based on definitions above, for each project submitted include: Current percentage of construction complete and the date when it was or will be completed. Size of the project Scope of the project The dollar value of the construction contract The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Whether the project was design build or design/bid/build Whether the project was renovation or new construction Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm's own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 10 pages. Please only include a narrative of the requested information; additional information will not be reviewed. Email responses and any questions to Ethan.s.phillips@usace.army.mil AND adyson.medley@usace.army.mil . This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately for responses to this market survey. NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer - System for Award Management, which indicates "All payments by the Government under this contract shall be made by electronic funds transfer (EFT)." Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg. Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected. ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov). The Method of Contractor Selection has not been determined at this Time.
Conceptual
Water / Sewer
$5,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 11, 2025
1401 Smithland Dam Rd, Brookport, IL
Related To This Project
Brookport, IL
Bid Date: May 30 2024
Brookport, IL
Bid Date: Mar 04 2024
Brookport, IL
Bid Date: Jun 17 2022
Brookport, IL
Bid Date: Sep 22 2023
Brookport, IL
Bid Date: Jul 06 2023
Brookport, IL
Bid Date: Feb 22 2023
Brookport, IL
Bid Date: Feb 15 2023
Brookport, IL
Bid Date: Jul 05 2022
Glenwood, IL
Bid Date: Nov 08 2024
Barrington, IL
Bid Date: Nov 08 2024
Chicago, IL
Bid Date: Nov 08 2024
Marshall, IL
Bid Date: Nov 08 2024
Western Springs, IL
Bid Date: Nov 08 2024
Aurora, IL
Bid Date: Nov 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.