Published February 21, 2025 at 7:00 PM
Updated April 4, 2025
Site work and paving for a road / highway in Limestone Township, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of February 21, 2025, is underway. The construction project — which stretches from Fauber Road at the north to Middle Road in the south — will also include reconstruction of Middle Road as it stretches east to Dirksen Parkway. The first stage of the project includes water main replacement, power pole relocation and other miscellaneous utility adjustments. The work is expected to last into April. The second stage is set to begin in July. It includes pavement removal, earth excavation, storm sewer installation, gravel placement, concrete pavement construction and curb and gutter construction. The final stage of the project will begin in the spring of 2026. During this stage, all driveway construction, sidewalk construction, multi-use path construction, seeding and other miscellaneous work will be completed by June 2026. Access to Middle Road, Morris Lane, West Fairview Road and Charleston Road will be maintained at all times. Motorists are asked to watch for flaggers and to use caution in the work zone. Region 3 District 4 Federal Project # YUFR(842) County(s) Peoria Key Route(s) FAU 6577A Marked Route(s) Maxwell Road Section(s) 19-00115-01-PV State Job #(s) C-94-006-22 PPS #(s) 0-05152-4002 4-10665-0000 Contract Specifics Completion Date: November 30, 2025 Plus 30 Working Days Questions not accepted as of October 29, 2024 04:30 PM Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 18, 2024. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 141 - Pavement Reconstruction, and the Construction of a Multi-Use Path on Maxwell Road
Under Construction
Roads / Highways
$7,099,475.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 8, 2024
January 7, 2025
N Maxwell Rd, Limestone Township, IL
Related To This Project
Limestone Township, IL
Bid Date: Aug 01 2025
Evanston, IL
Bid Date: Nov 05 2024
Edwardsville, IL
Bid Date: Nov 08 2024
Creal Springs, IL
Bid Date: Jan 17 2025
Marion, IL
Bid Date: Dec 13 2024
Tuscola, IL
Bid Date: Dec 13 2024
Urbana, IL
Bid Date: Dec 13 2024
Gurnee, IL
Bid Date: Nov 08 2024
Collison, IL
Bid Date: Dec 13 2024
Camargo, IL
Bid Date: Nov 08 2024
Glen Ellyn, IL
Bid Date: Nov 08 2024
Coyne Center, IL
Bid Date: Nov 08 2024
Litchfield, IL
Bid Date: Oct 29 2024
Champaign, IL
Bid Date: Oct 29 2024
Coyne Center, IL
Bid Date: Nov 08 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.