BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work for a mixed-use development in Mountain View, California. Design plans call for site work for a golf course; pipeline; restaurant; sidewalk / parking lot; and water / sewer project.

As of September 17, 2025, per the owner, this project is in the design phase. An engineer has been named. This project is expected to begin in the summer of 2027. ....................................................................................... To maintain regulatory compliance and ensure an environment free from the hazardous impacts of explosive methane gas, upgrades to the existing GCCS are necessary. These improvements will optimize system performance while preventing surface emissions and the lateral migration of landfill gas. The Back Nine GCCS is situated on the southwest corner of the 544-acre landfill site, encompassing the Shoreline Golf Links, a Robert Trent Jones-designed course. It is in the vicinity of Holes 10 through 18, an environmentally sensitive area, and the Shoreline Athletic Fields (see Figure 3). Since these holes sit atop the GCCS, they will be impacted during the GCCS improvement and will require renovation. To maintain design continuity with the original golf course design and preserve its designation, the Consultant must retain Robert Trent Jones Golf Course Architects as a subconsultant. The City of Mountain View (City), incorporated in 1902, is a full-service charter city with a City Council/City Manager form of government and over 690 regular positions representing 14 departments. It is a municipal corporation of the state, located in Santa Clara County, California. The City is just over 12 square miles with a population of approximately 86,500 and has a General Operating Fund budget for Fiscal Year 2024-25 of approximately $192.3 million. The method of Contractor Selection has not been Determined at this time.

Design

Pipeline

$50,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
206
Bidding Soon
2,418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.