BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2024 at 7:00 PM

Updated November 22, 2024

Site work and renovation of a civil project in Aurora, Oregon. Completed plans call for the renovation of a development; and for site work for a development.

Aurora Cole Lane Booster Station and Reservoir. Site Address: 21901 Cole Ln NE Aurora, OR 97002. Questions regarding the project should be referred to Mark Gunter, Public Works Supervisor (pws@ci.aurora.or.us), Luke Tabor, PE, Project Manager, Keller Associates, (ltabor@kellerassociates.com). The engineer’s estimate is $8,000,000. Document notes. The non-refundable cost of printed Bidding Documents is $350.00 per set, payable to "Keller Associates, Inc.". Upon Issuing Office's receipt of payment, printed Bidding Documents will be sent via the prospective Bidder's delivery method of choice; the shipping charge will depend on the shipping method chosen. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Site Directions: The project work site is located on a vacant property off the north side of Cole lane in Aurora, Oregon. The proposed well location is presented in Exhibit A. The property, which is now owned by the City of Aurora, was formerly part of a single family residential lot. Description: The Project includes the following Work: A. Site Work: Onsite Work entails the construction of an onsite overflow pond; a dechlorination manhole; installation of all yard piping; trench excavation; shoring; pipe bedding; pipe zone backfill; general backfill; ductile iron, corrosion coated, restrained mechanical joints and valving; disinfection and pressure testing; installation of a new emergency generator; construction of ground improvements for the reservoir; and all Labor, Materials, and incidentals necessary to complete the Work as shown. B. Reservoir: The Reservoir entails construction of a new 1.2 MG Prestressed Concrete Reservoir; overflow and drain installation; level sensing instrumentation; intrusion alarms; a Tideflex mixing system; all associated piping and valving; and all Labor, Materials, and incidentals necessary to complete the Work as shown.; C. Booster Station: The booster station entails the installation of three end suction pumps and one split-case pump; a PRV; a CMU block building; all associated piping and valving; all associated HVAC and plumbing; installation of new VFDs; and all Labor, Materials, and incidentals necessary to complete the Work as shown. D. Offsite Piping: Offsite Piping includes the installation of approximately 2,000 feet of 16-inch diameter, C900 polyvinyl chloride (PVC) water pipeline within existing easements or public right-of-way; trench excavation; shoring; pipe bedding' pipe zone backfill; ductile iron, coated restrained, mechanically-restrained joints and valving; disinfection and pressure testing; and all Labor, Materials, and incidentals necessary to complete the Work as shown.

Award

Conservation and Development

$6,920,605.00

Public - City

Renovation, Site Work

93

33

51

11

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
74
Bidding Soon
1,080
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

January 13, 2025

Project location map

21901 Cole Ln NE, Aurora, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.