BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and asbestos abatement for an educational facility in Montebello, California. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

SCOPE OF WORK Abatement contractor must have mold credentials oContractor must have all must be posting signage oAll work to be done in full compliance with all State and Local Regulations oContractor must work within all OSHA and AQMD regulations oContractor be responsible for any notifications oContractor will contain all work area oWe need to wet wipe all contents and set aside a designated area. oAll non hard surface items will be passed through a negative air machine oContractor responsible for movement of all furniture oWe need to have a three stage decon chamber with working shower oContractor shall provide any personal air sampling oContractor to use wet methods oHepa vacuuming needed throughout the clean-up oMust have a registered negative air machine and hepa vac oContractor to square of areas where water came through the ceiling oContractor to clean inside the cavity and square off ceiling (damaged area) oContractor to remove wet or affected insulation oYou will be monitored by a third party Environmental consultant oConsultant will do all final clearances oWe need to place a temporary piece of panel at the exposed ceiling oContractor to tear down all plastic and remove all equipment once air test has been achieved oFacilities must be present every time you show up to the school site. oDo not abate in the presence of students and staff oAll PPE proper for mold abatement oThe cavity where the leak occurred must have all mold removed and kilz oAll hazards to be properly bagged and disposed of oContractor to notify all proper agencies oContractor to provide all labor and materials oConsultants may add some small modifications to scope and containment. oNegative air and hepa vac must be State certified oAll work must be done in full compliance with AHERA school regulations oAll work to be done after school hours to include weekends and Sundays oContractor must provide a timeline at least 14 days in advance of work oAsbestos Survey Attached. M/WBE's are encouraged to participate in the bid process.

Bid Results

Educational

$25,900.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,266
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

November 22, 2024

img_map_placeholder

1400 W Madison Ave, Montebello, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.