Site work and outdoor lighting for a bridge / tunnel in Lawrenceburg, Indiana. Completed plans call for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

Award is anticipated TUESDAY NOVEMBER 5, 2024 at 9:00 AM at the Dearborn County Commissioners meeting. THIS PROJECT CONSISTS OF THE REHABILITATION OF A 5 SPAN REINFORCED CONCRETE SLAB BRIDGE. PARTIAL CONCRETE SLAB REMOVAL SHALL OCCUR ON THE WEST EDGE OF THE BRIDGE FOR FULL LENGTH OF BRIDGE OR ABOUT 174 LFT. IN ADDITION, CONCRETE SLAB PATCHING SHALL OCCUR ON THE EAST EDGE FOR A FEW SPANS ON THE SOUTH END. NEW GURDRAIL SHALL BE ADDED ON THE WEST SIDE ONLY. IN ADDITION, SEDIMENT REMOVAL AND NEW RIPRAP SHALL BE COMPLETED UNDER AND AROUND THE BRIDGE. THE PROJECT IS NORTH OF THE INTERSECTION OF US 50 AND GREEN BLVD/WILSON CREEK ROAD APPROXIMATELY 1.15 MILES After review and award of a contract, the Owner will provide a "Notice to Proceed" to the Contractor. Contractor will then have 10 working days after said "Notice to Proceed" to commence construction and until AUGUST 28, 2025 to achieve substantial completion and an additional 15 days, SEPTEMBER 12, 2025 to achieve final completion. As an Alternated Bid Item, full closure shall be considered. If closure of the roadway is accepted as an alternate, the roadway closure time cannot extend past 90 days from first closure and full closure could not start until after November 30, 2024. Contractor will be assessed $300.00 a day liquidated damages for any work remaining over and above either of the specified contract completion dates or the 90 day alternate road closure item. Payment to be made on a standard monthly claim basis, with 10% retainage, and said retainage may be held up to three months after the successful completion of this contract. There is no retainage reduction for this project. Bidders must be pre-qualified with INDOT for work type D(a) Highway or Bridge over Water. There is no pre-bid conference scheduled for this project. Each bid must be accompanied by a Bid Bond or Certified Check in a sum equal to 10% of the amount of the bid unless otherwise specified, and a completed Non-Collusion Affidavit. Bid prices must be firm for a period of ninety (90) days from the bid opening date. Should a successful bidder withdraw his bid, or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of his bid, the owner may declare the Bid Security forfeited as liquidated damages, not as penalty. The successful bidder shall furnish a Performance and Labor and Materials Payment Bond in an amount equal to one hundred percent (100%) of the contract sum with an approved surety company. Said bond shall remain in full force and effect for a period of one (1) year after date of final acceptance of the work. The Dearborn County Commissioners, reserve the right to accept or reject any bid and to waive any or all formalities.

Bid Results

Bridges / Tunnels

$266,288.00

Public - County

Outdoor Lighting, Site Work

45

11

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
44
Bidding Soon
1,372
All Active Projects
525
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

img_map_placeholder

Wilson Creek Rd, Lawrenceburg, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.