Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in Springfield, Missouri. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
SCOPE: Rehabilitation of the James River Lift Station consisting of check valve replacements, installation of electric valve actuators, and other miscellaneous station rehabilitation. Vacuum relief valves will also be installed on the 24" and 36" force mains leaving the lift station. Work of the Project generally includes the replacement of select process equipment, equipment and support repaired, coating of the existing piping, and associated electrical improvements within the booster pump station, as well as installation of four (4) vacuum relief valve vaults along existing force main. More specifically, the Work includes, but is not limited to, construction of the following: 1. Replacement of all four (4) check valves and associated piping and instrumentation improvements. 2. Replacement of existing manual valve actuators with automated valve actuators and associated electrical improvements. 3. Rehabilitation of two (2) concrete pipe supports at discharge piping elbows. 4. Installation of three (3) H2S sensors and associated electrical improvements. 5. Replacement of existing pump vibration switches and associated electrical improvements. 6. Replacement of power system monitoring equipment. 7. Preparation and recoating of all piping within the pump station. 8. Installation of four (4) vacuum relief valve vaults on existing forcemains. 9. Site improvements to support items above. 10. Site electrical improvements to support items above including duct banks, instrumentation and controls. The cutoff for any questions about this bid is October 30, 2024, at 10:00 A.M. (CST). BID BOND: Each bid must be accompanied by a bid bond in the form of a cashier's check made payable to the City of Springfield - Director of Finance, or a bid bond duly executed by the bidder as principal and having as surety thereon a surety company satisfactory to the City. The bond so furnished shall be in the amount not less than five percent (5%) of the amount of the total bid price. Checks or bid bonds will be returned to all except the three (3) lowest qualified bidders within ten (10) days after the opening of bids and the remaining checks or bid bonds will be returned within five (5) working days after the City of Springfield and the successful bidder have executed the contract for the work. ERFORMANCE BOND, AND A LABOR AND MATERIALS PAYMENT BOND: The Contractor shall furnish a Performance Bond and a Labor and Materials Payment Bond with surety approved by the City and on the forms approved by the City. Each bond shall be in the full amount of the contract conditioned upon the full and faithful performance of all major terms and conditions of this contract and payment of all labor and material suppliers. AWARD: A Contract shall be awarded to that responsible and responsive bidder whose bid, conforming to the Invitation for Bid, will be most advantageous (lowest price and best value) to the City. The Contractor agrees to bring the work to Final Completion within forty-five (45) consecutive calendar days from the date of Substantial Completion. LIQUIDATED DAMAGES: In submitting this bid, the bidder further agrees to pay to or allow the City as liquidated damages the sum of Five Hundred Dollars ($500.00), for each calendar day thereafter that the work does not achieve Substantial Completion. The Contractor agrees to bring the work to Final Completion within forty-five (45) consecutive calendar days from the date of Substantial Completion; the Contractor further agrees to pay to or allow the City as liquidated damages the sum of Fifty Dollars ($50.00), for each calendar day thereafter that the work does not achieve Final Completion. The City shall have a minimum of ninety (90) calendar days from the date of the opening to accept the bidder's offer. THE RIGHT TO AUDIT: The bidder agrees to furnish supporting detail as may be required by the City to support charges or invoices, to make available for audit purposes all records covering charges pertinent to the purchase, and to make appropriate adjustments in the event discrepancies are found. The cost of any audit will be paid by the City. The City shall have the right to audit the bidder's records pertaining to the work/product for a period of three (3) years after final payment. The City is withdrawing this Invitation for Bid for James River Lift Station Improvements. This project may be rebid at a future date. For further information see Addendum 1.
Project Abandoned
Water / Sewer
$100,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2024
June 12, 2025
To Be Determined, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Nov 12 2024
Springfield, MO
Bid Date: May 04 2021
Springfield, MO
Bid Date: Nov 14 2024
Springfield, MO
Bid Date: Dec 04 2024
Springfield, MO
Bid Date: Nov 06 2024
Springfield, MO
Bid Date: Nov 18 2024
Springfield, MO
Bid Date: Nov 06 2024
Springfield, MO
Bid Date: Nov 14 2024
Springfield, MO
Bid Date: Nov 26 2024
Springfield, MO
Bid Date: Oct 31 2024
Springfield, MO
Bid Date: Jan 31 2025
Springfield, MO
Bid Date: Nov 05 2024
Springfield, MO
Bid Date: Oct 29 2024
Springfield, MO
Bid Date: Nov 21 2024
Springfield, MO
Bid Date: Oct 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.