Site work for a civil project in Tignish, Prince Edward Island. Completed plans call for site work for a bridge / tunnel; and road / highway.

The scope of this work includes, but is not necessarily limited to the following: the supply of all labour, equipment, and materials necessary to completely replace the existing bridge structure with a new bridge structure. The work on this project shall consist of but not limited to: excavation; slope protection; environmental controls; demolition and removal of existing structure; steel piles; concrete formwork and accessories; concrete reinforcement; cast-in-place concrete; new timber structure; structural steel barrier; rip rap; gabion baskets; road work; and all other ancillaries required to completely install the structure to the satisfaction of the Owner. Note that construction must start on site no later than 8 January 2025. The bridge/roadway (entire width) complete with temporary concrete barriers must be opened to traffic no later than 15 March 2025, with no interruption to traffic after this date. Spring 2025 work shall be completed no later than 27 June 2025, with maximum duration two (2) weeks from startup to completion. A bid bond equal to or greater than the amount stipulated in schedule a - schedule of special provisions. The bond shall be from a surety company authorized to carry on business in canada guaranteeing to supply a performance bond equal to 50% of the contract value, excluding hst and a labour and material bond equal to 25% of the contract value, excluding hst. A certified cheque in the minimum amount of ten percent (10%) of the contract value, excluding hst

Bid Results

Bridges / Tunnels

$621,363.00

Public - State/Provincial

Site Work

15

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
12
Bidding Soon
141
All Active Projects
38
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

January 8, 2025

img_map_placeholder

Haywood Rd, Tignish, PE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.