BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Renovation of an educational facility in Dayton, Ohio. Working plans call for the renovation of a educational facility.

**As of February 6, 2026, bid was unawardable and is going to be rebid. No definite date for the rebid.** WSU25-0103 NEC Chilled Beam Corrective Work Re-Bid The project is to replace failed control valves and other miscellaneous HVAC equipment and controls in Wright State University's Neuroscience Engineering Collaboration (NEC) building. EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011. Pre-bid Meeting: None anticipated. Contract Estimated Cost General HVAC Trades (Lead) $2,000,000 QA date - 12-16-2025 RFIs received more than 7 days before the bid opening.

Final Planning

Educational

$2,000,000.00

Public - State/Provincial

Renovation

30

10

5

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
199
Bidding Soon
2,425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2025

August 6, 2026

Project location map

3640 Colonel Glenn Hwy, Dayton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.