BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Birmingham, Alabama. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Construction of Cahaba Pump Station Intake Structure Repair and Rehabilitation Project includes but not limited to the following scope of work: 1. Mobilization and demobilization. 2. Repair and rehabilitate defects in the concrete on the Cahaba Pump Station motor deck, valve room, intake room, and exterior walls. This includes removal, surface preparation and installation of repair materials on deteriorated areas and cracks as indicated on the drawings and as required in the specifications. Each bid shall be accompanied by a cashier's check, drawn on an Alabama Bank, or bid Bond in the amount of five percent (5%) of the bid not to exceed $50,000.00 in the form and subject to conditions provided for in the Specifications. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100 percent of the Contract Award. The Water Works Board of the City of Birmingham ("BWWB") has adopted a voluntary Historically Underutilized Business ("HUB") Program designed to encourage the participation of HUB firms in construction projects. To that end, the BWWB will never exclude any firm from participation in, deny any person benefits of, or otherwise discriminate in connection with the award and performance of BWWB contracts based on racial, gender, social, or economic status. It is the intent of the BWWB to foster competition among contractors, suppliers and vendors that will result in better quality and more economical services for the BWWB. Under this program, the BWWB has established a goal of 30% participation of HUB firms for services required for BWWB construction projects. The BWWB's stated goal will not be the determining factor in construction contract awards; rather bidders must demonstrate compliance with the Good Faith Efforts, more particularly outlined in the HUB Program, toward meeting said goal. Doc note: Prime Contractor bidders may obtain one complete set of Bidding Documents on or after September 9, 2024, from the office of the Chief Engineer of The Water Works Board of the City of Birmingham upon payment of a $300.00 deposit by company check or by certified check and signing a nondisclosure statement. No personal checks or any other form of payment except as noted will be accepted. This deposit shall be refunded in full to each prime contractor bidder upon the return of the Bidding Documents in a reusable condition within 10 days after the bid opening. Additional sets of Bidding Documents for prime contractor bidders, subcontractors, vendors or dealers may be obtained upon payment of said $300.00 deposit and signing a nondisclosure statement. This deposit shall be refunded less the costs of printing, reproduction, handling, and distribution, upon return of the documents in reusable condition within 10 days after the bid opening. Company check or Certified check for documents shall be made payable to The Water Works Board of the City of Birmingham, 3600 First Avenue North, Birmingham, Alabama, 35222 and mailed to the Attn: Hattye McCarroll P.E.; Chief Engineer. No additional charge will be made for delivery via UPS ground. Those requesting shipment of documents via carriers other than UPS ground will be made at the requesting firm's expense. Partial sets of Bidding Documents will not be available to any Bidder. Neither the OWNER nor the ENGINEER will be responsible for full or partial sets of Bidding Documents, including any addenda, obtained from other sources. No Bidder may withdraw or alter a bid within 60 calendar days after the actual date of the bid opening. The OWNER reserves the right to reject any and all proposals, the right to waive irregularities or to accept any proposal deemed to be in the best interest of the OWNER.

Award

Water / Sewer

$567,150.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
33
Bidding Soon
631
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

img_map_placeholder

4012 Sicard Hollow Rd, Birmingham, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.