BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Owaneco, Illinois. Completed plans call for site work for a water / sewer project.

The Village of Owaneco (Owner) isrequesting Bids for the construction of the following Project: PROPOSED PHASE 72, EJ WATER COOPERATIVE, INC., VILLAGE OF OWANECO WATER MAIN REPLACEMENT, CHRISTIAN COUNTY, IL. The Project includes the following Work: Replacement ofapproximately 14,100 LF of 6" PVC, 2,460 LF of 6" Bores, valves, hydrants, meters, and appurtenances for acomplete system. Bids are requested for the following Contract: Proposed Phase 72, EJ Water Cooperative, Inc., Village of Owaneco Water Main Replacement, Christian County, IL The Issuing Office for the Bidding Documents is: Milano &Grunloh Engineers, LLC 114 W.Washington Ave., Effingham, IL 62401 Deposit checks for bidding documents should bemade to Milano &Grunloh Engineers, LLC. There will be no refunds issued for bidding documents. Pre-bid Conference -N/A Instructions to Bidders: For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. A certified check or bank draft, payable to the order of Village of Owaneco, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. This project is funded in whole or part with grant funds from the Community Development Block Grant (CDBG) program. Attention iscalled tothe fact that 1) not less than the Federal prevailing wages asset forth inthe Contract Documents must bepaid onthis project; 2) The work to be performed under this contract is subject to the requirements ofSection 3,24CFR Part 75; and 3) The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. The Village of Owanecoreservesthe right to reject any or allBidsortowaive any informalities in bidding. Bids maybeheldbythe Village of Owaneco For a period not to exceed 30 days from the dateofthe opening of Bids forthe purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract.

Bid Results

Water / Sewer

$1,383,457.00

Public - City

Site Work

49

16

18

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
59
Bidding Soon
753
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 16, 2024

img_map_placeholder

Multiple Locations, Owaneco, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.