BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2024 at 7:00 PM

Updated December 6, 2024

Site work and paving for a road / highway in Belleville, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Freedom Drive Roadway Improvements The work to be done under this project consists of approximately 1,070 square yards of portland cement concrete reconstruction, 700 feet of combination concrete mountable curb and gutter replacement on Freedom Drive, as well as driveway improvements and various other improvements. The project also consists of approximately 240 square yards of HMA resurfacing. These improvements will be located on Freedom Drive from South Belt West to Harmony Drive in St. Clair Township near Belleville IL. COMPLETION OF IGD FORMS: Each bidder shall complete the respective forms provided by the St. Clair County Intergovernmental Grants Department (IGD) and submit with their bid proposal. Bidder is subject to non-acceptance of bid proposal should forms not be completed and submitted with the proposal. BE PARTICIPATION: Include Minority Business Enterprise (MBE) participation of fifteen percent (15%) of the awarded Community Development Block Grant (CDBG) funds to the project. Participation of a MBE is required by the US Department of Housing Participation Contractor's Agreement and submit a completed MBE Contractor Certification form reflecting the participating MBE as a subcontractor (unless a supplier) as a part of the bid proposal . AFFIRMATIVE ACTION - SECTION 3: The requirements of Section 3 of the Housing and Urban Development Act of 1968 (12 USC 1701u) are included in the IGD documentation requirements and shall be completed and submitted as a part of the bid proposal. All work shall be performed in accordance with the IDOT Standard Specifications for Road and Bridge Construction, edition in effect at the time of the bid. Each Bidder must deposit with his bid, security in the amount of not less than five percent (5%) of the Bidder's total bid price, such security being an acceptable bid bond, certified check, or cashier's check. The successful Bidder will be required to furnish a satisfactory Performance Bond in the full amount of the bid. No Bidder may withdraw his bid for a period of thirty (30) days after the actual date of the opening thereof. The St. Clair Township, Illinois, reserves the right to reject any or all bids and to waive any informalities or technicalities in the bidding . The Contractor shall coordinate construction with the ICC project 24-19124-03-RR. These projects may be constructed at the same time. Reconstruction along Freedom Drive adjacent to Canadian National at-grade crossing identified as AAR/DOT #313644T railroad milepost 11.35-G

Award

Roads / Highways

$239,078.00

Public - County

Paving, Site Work

34

9

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
90
Bidding Soon
1,300
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 25, 2024

Project location map

Freedom Dr, Belleville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.