BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2024 at 8:00 PM

Updated October 25, 2024

Site work for a water / sewer project in Green River, Utah. Completed plans call for site work for a water / sewer project.

Federal Regulations: This is a federally funded project requiring compliance with the State Fair Share Goal and federal EEO regulations. Davis-Bacon wages apply to this project and are made a part of these contract documents. All bidders must comply with the requirements of the Build America Buy America Act (BABAA) including the American Iron and Steel Requirements. A bid bond in the amount of five percent (5%) of the bid, made payable to the Owner, will accompany the Bid. Major Items of work include: 1. GAC System & CMU Building Installation - 1 Lump Sum.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
42
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

November 22, 2024

Project location map

To Be Determined, Green River, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.